What is a house renovation?

A house renovation brings an older or tired home up to date. It can include rewiring, a new heating system, replastering, new floors, windows, kitchens and bathrooms, and changes to the layout. A full renovation is often combined with an extension or loft conversion.
How much does a house renovation cost in Amersham?
In Amersham, a house renovation typically costs £1,000–£2,000 per m² for a medium to full renovation, including VAT at 20% (5% may apply to homes empty for two years or more). For a typical 90 m² project that is roughly £90,000–£180,000. We start from a UK-wide guide and adjust it for the South East, where labour and materials are typically about 12% above average. Design, structural calculations and council fees are extra.
| Size or type | Guide range |
|---|---|
| Smaller project (63 m²) | £63,000–£126,000 |
| Typical project (90 m²) | £90,000–£180,000 |
| Larger project (126 m²) | £126,000–£252,000 |
| Rate per m² | £1,000–£2,000 |
The main things that change the cost:
- Windows and doors
- Extent of rewiring and replumbing
- Whether you live in during the work
- Finishes
A guide range is only a starting point: the guide price tool gives an instant figure for your size, and a free survey turns it into a fixed quote.
Do you need planning permission for a house renovation in Amersham?
Approvals for a house renovation in Amersham follow the rules for England. In England internal renovation usually does not need planning permission unless the house is listed, when listed building consent covers internal work too. Notifiable work such as rewiring, structural changes, new windows and heating must meet building regulations.
Where work involves a shared wall, building on the boundary, or digging foundations within 3 metres of a neighbour’s building and deeper than its foundations (or within 6 metres for deeper work), the Party Wall etc. Act 1996 applies and notices must be served before work starts.
We check this for your address before design work starts, so there are no surprises later.
What we handle
On a typical house renovation we handle:
- Condition survey and scope of works
- Building control for notifiable work
- Decoration
- Joinery, doors and floors
- Kitchens and bathrooms
- Plastering and boarding
How long does it take?
Build time is typically 8 to 20 weeks on site depending on scope. Before that, surveys, drawings and approvals usually take 6 to 12 weeks, longer if the council asks for changes.
Building in Amersham
The South East has a broad mix of housing, from Victorian terraces in the towns to post-war semis and newer estates, so extension types vary street by street.
If your home is in Amersham or close by in Chesham, Chalfont Saint Peter and Gerrards Cross, a free home visit is the first step.
How it works
- 01
Free visit
We look at the property, talk through what you want and measure up. There is no charge and no obligation.
- 02
Design and fixed quote
Drawings, structural calculations and an itemised, fixed price for the agreed specification.
- 03
Permissions sorted
Applications, building control and neighbour arrangements, all before the start date.
- 04
Construction and completion
We build, put right any snags and hand over the building control certificate.
Questions about house renovations in Amersham
Can I live in the house during a renovation?
For light work, yes. For a full renovation, most clients move out for some or all of the job.
How much does a house renovation cost in Amersham?
In Amersham, a house renovation typically costs £1,000–£2,000 per m² for a medium to full renovation, including VAT at 20% (5% may apply to homes empty for two years or more). A typical 90 m² project comes to roughly £90,000–£180,000. Your fixed price depends on the survey and drawings.
Do you renovate listed buildings?
Yes, with listed building consent and appropriate materials.
Is VAT reduced on renovations?
Usually not; the standard 20% rate applies. A reduced 5% rate can apply when renovating a home that has been empty for at least two years.
How long does a house renovation take in Amersham?
Typically 8 to 20 weeks on site depending on scope. Design and approvals beforehand usually take 6 to 12 weeks.