SK Developments Free home visit0800 088 6248 Get a quote

NottinghamshireHouse renovations

House renovations in Arnold

Thinking about a house renovation in Arnold? We can take it from first ideas to finished, signed-off work, with a written programme before work starts.

Guide price in Arnold

£850–£1,700 per m² for a medium to full renovation

In Arnold, a house renovation typically costs £850–£1,700 per m² for a medium to full renovation, including VAT at 20% (5% may apply to homes empty for two years or more). For a typical 90 m² project that is roughly £76,500–£153,000.

Book a free home visit

Tell us about your project. We reply to arrange a visit and a fixed quote.

Free home visit and measured survey
Fixed price for the agreed specification
Drawings, approvals and build in one contract
Building control sign-off arranged
England, Wales, Scotland and Northern Ireland

What is a house renovation?

Renovated Victorian living room with a restored fireplace, sash windows and pine floorboards

A house renovation brings an older or tired home up to date. It can include rewiring, a new heating system, replastering, new floors, windows, kitchens and bathrooms, and changes to the layout. A full renovation is often combined with an extension or loft conversion.

How much does a house renovation cost in Arnold?

In Arnold, a house renovation typically costs £850–£1,700 per m² for a medium to full renovation, including VAT at 20% (5% may apply to homes empty for two years or more). For a typical 90 m² project that is roughly £76,500–£153,000. Prices across the East Midlands are typically 5% below the UK average for this kind of work, which is reflected in the range for Arnold. Design, structural calculations and council fees are extra.

Guide prices for Arnold, including VAT at 20% (5% may apply to homes empty for two years or more)
Size or typeGuide range
Smaller project (63 m²)£53,500–£107,000
Typical project (90 m²)£76,500–£153,000
Larger project (126 m²)£107,000–£214,000
Rate per m²£850–£1,700

What moves the price most:

  • Windows and doors
  • Kitchens and bathrooms
  • Finishes
  • Extent of rewiring and replumbing

Your exact price depends on the survey and drawings. The guide price tool gives a quick range in the meantime.

Do you need planning permission for a house renovation in Arnold?

Before anything is built in Arnold, we confirm which approvals apply in England. In England internal renovation usually does not need planning permission unless the house is listed, when listed building consent covers internal work too. Notifiable work such as rewiring, structural changes, new windows and heating must meet building regulations.

Where work involves a shared wall, building on the boundary, or digging foundations within 3 metres of a neighbour’s building and deeper than its foundations (or within 6 metres for deeper work), the Party Wall etc. Act 1996 applies and notices must be served before work starts.

Our first visit includes a check of your planning history, so you know the route before paying for drawings.

What we handle

The work we manage on a house renovation:

  • Decoration
  • Kitchens and bathrooms
  • Condition survey and scope of works
  • Joinery, doors and floors
  • Plastering and boarding
  • Structural repairs and damp treatment

How long does it take?

Expect 8 to 20 weeks on site depending on scope. Design and approvals come first and typically take 6 to 12 weeks, depending on the approval route.

Building in Arnold

The East Midlands has a mix of red-brick terraces, inter-war semis and newer estates, so rear extensions and garage conversions are common projects.

Our Arnold coverage includes postcode districts NG5, and we also work in nearby places such as Nottingham, Hucknall and West Bridgford.

How it works

  1. 01

    Free visit

    We look at the property, talk through what you want and measure up. There is no charge and no obligation.

  2. 02

    Design and pricing

    Design options, then a fixed quote based on the chosen drawings and specification.

  3. 03

    Permissions sorted

    Applications, building control and neighbour arrangements, all before the start date.

  4. 04

    Construction and completion

    We build, put right any snags and hand over the building control certificate.

Questions about house renovations in Arnold

Does a renovation need building regulations approval?

Some parts do, such as rewiring, structural changes, new windows and heating systems. We handle notifications.

Who approves a house renovation in Arnold?

Planning matters in Arnold go to the council covering your address, and the work needs building control approval. We prepare and submit the applications for you.

Is VAT reduced on renovations?

Usually not; the standard 20% rate applies. A reduced 5% rate can apply when renovating a home that has been empty for at least two years.

How long does a full renovation take?

Typically 8 to 20 weeks on site depending on the size of the house and scope.

How much does a house renovation cost in Arnold?

In Arnold, a house renovation typically costs £850–£1,700 per m² for a medium to full renovation, including VAT at 20% (5% may apply to homes empty for two years or more). A typical 90 m² project comes to roughly £76,500–£153,000. Your fixed price depends on the survey and drawings.

Tell us about your project in Arnold and we will arrange a free home visit.

Call 0800 088 6248 or get an instant guide price online.

Call 0800 088 6248Get a guide price