What is a house renovation?

A house renovation brings an older or tired home up to date. It can include rewiring, a new heating system, replastering, new floors, windows, kitchens and bathrooms, and changes to the layout. A full renovation is often combined with an extension or loft conversion.
How much does a house renovation cost in Cramlington?
In Cramlington, a house renovation typically costs £800–£1,600 per m² for a medium to full renovation, including VAT at 20% (5% may apply to homes empty for two years or more). For a typical 90 m² project that is roughly £72,000–£144,000. That range is adjusted for the North East, where domestic building work typically costs around 10% below the national average. Design, structural calculations and council fees are extra.
| Size or type | Guide range |
|---|---|
| Smaller project (63 m²) | £50,500–£101,000 |
| Typical project (90 m²) | £72,000–£144,000 |
| Larger project (126 m²) | £101,000–£201,500 |
| Rate per m² | £800–£1,600 |
The main things that change the cost:
- Extent of rewiring and replumbing
- Kitchens and bathrooms
- Structural and damp repairs
- Windows and doors
Use the guide price tool to see how size and specification change the figure, then ask for a written, itemised quote.
Do you need planning permission for a house renovation in Cramlington?
Whether you need planning permission depends on your house and its location in England. In England internal renovation usually does not need planning permission unless the house is listed, when listed building consent covers internal work too. Notifiable work such as rewiring, structural changes, new windows and heating must meet building regulations.
Building regulations approval comes from the council’s building control service or a registered building control approver. The work is inspected at key stages, such as foundations, drainage and insulation, and a completion certificate is issued at the end.
Our first visit includes a check of your planning history, so you know the route before paying for drawings.
What we handle
From survey to sign-off, the job normally involves:
- Structural repairs and damp treatment
- Condition survey and scope of works
- Kitchens and bathrooms
- Plastering and boarding
- Rewiring and heating upgrades
- Joinery, doors and floors
How long does it take?
Expect 8 to 20 weeks on site depending on scope. Allow time beforehand for drawings and approvals, usually 6 to 12 weeks.
Building in Cramlington
Across the North East, colliery-era terraces and newer estates sit side by side, so the right project depends on the house type.
If your home is in Cramlington or close by in Bedlington, Blyth and Ashington, a free home visit is the first step.
How it works
- 01
Free visit
We look at the property, talk through what you want and measure up. There is no charge and no obligation.
- 02
Drawings and written quote
We prepare the design and give you a written, itemised quote with inclusions and exclusions.
- 03
Approvals
Planning or permitted development confirmation, building regulations and any party wall matters.
- 04
Build and sign-off
We run the build to a written programme and hand over the completion certificate.
Questions about house renovations in Cramlington
How much does a house renovation cost in Cramlington?
In Cramlington, a house renovation typically costs £800–£1,600 per m² for a medium to full renovation, including VAT at 20% (5% may apply to homes empty for two years or more). A typical 90 m² project comes to roughly £72,000–£144,000. Your fixed price depends on the survey and drawings.
Who approves a house renovation in Cramlington?
Planning matters in Cramlington go to the council covering your address, and the work needs building control approval. We prepare and submit the applications for you.
Do you renovate listed buildings?
Yes, with listed building consent and appropriate materials.
Does a renovation need building regulations approval?
Some parts do, such as rewiring, structural changes, new windows and heating systems. We handle notifications.
How long does a full renovation take?
Typically 8 to 20 weeks on site depending on the size of the house and scope.
