What is a house renovation?

A house renovation brings an older or tired home up to date. It can include rewiring, a new heating system, replastering, new floors, windows, kitchens and bathrooms, and changes to the layout. A full renovation is often combined with an extension or loft conversion.
How much does a house renovation cost in Hitchin?
In Hitchin, a house renovation typically costs £950–£1,900 per m² for a medium to full renovation, including VAT at 20% (5% may apply to homes empty for two years or more). For a typical 90 m² project that is roughly £85,500–£171,000. That range is adjusted for the East of England, where domestic building work typically costs around 6% above the national average. Design, structural calculations and council fees are extra.
| Size or type | Guide range |
|---|---|
| Smaller project (63 m²) | £60,000–£119,500 |
| Typical project (90 m²) | £85,500–£171,000 |
| Larger project (126 m²) | £119,500–£239,500 |
| Rate per m² | £950–£1,900 |
What moves the price most:
- Kitchens and bathrooms
- Whether you live in during the work
- Finishes
- Structural and damp repairs
A guide range is only a starting point: the guide price tool gives an instant figure for your size, and a free survey turns it into a fixed quote.
Do you need planning permission for a house renovation in Hitchin?
Here is how the rules work for a house renovation in England. In England internal renovation usually does not need planning permission unless the house is listed, when listed building consent covers internal work too. Notifiable work such as rewiring, structural changes, new windows and heating must meet building regulations.
Building regulations approval comes from the council’s building control service or a registered building control approver. The work is inspected at key stages, such as foundations, drainage and insulation, and a completion certificate is issued at the end.
We check this for your address before design work starts, so there are no surprises later.
What we handle
What we take care of:
- Kitchens and bathrooms
- Plastering and boarding
- Condition survey and scope of works
- Joinery, doors and floors
- Structural repairs and damp treatment
- Building control for notifiable work
How long does it take?
Build time is typically 8 to 20 weeks on site depending on scope. Allow time beforehand for drawings and approvals, usually 6 to 12 weeks.
Building in Hitchin
Many towns in the East of England have estates built since the 1970s, where garage conversions and rear extensions are popular.
If your home is in Hitchin or close by in Letchworth Garden City, Stevenage and Luton, a free home visit is the first step.
How it works
- 01
Survey and brief
We visit, discuss your ideas and budget, and survey the property or site at no cost.
- 02
Design and pricing
Design options, then a fixed quote based on the chosen drawings and specification.
- 03
Approvals
Planning or permitted development confirmation, building regulations and any party wall matters.
- 04
Build and sign-off
We run the build to a written programme and hand over the completion certificate.
Questions about house renovations in Hitchin
Can I live in the house during a renovation?
For light work, yes. For a full renovation, most clients move out for some or all of the job.
Do I need planning permission to renovate?
Internal work usually does not need planning permission unless the house is listed. External changes may.
Does a renovation need building regulations approval?
Some parts do, such as rewiring, structural changes, new windows and heating systems. We handle notifications.
How much does a house renovation cost in Hitchin?
In Hitchin, a house renovation typically costs £950–£1,900 per m² for a medium to full renovation, including VAT at 20% (5% may apply to homes empty for two years or more). A typical 90 m² project comes to roughly £85,500–£171,000. Your fixed price depends on the survey and drawings.
How long does a house renovation take in Hitchin?
Typically 8 to 20 weeks on site depending on scope. Design and approvals beforehand usually take 6 to 12 weeks.
