What is a house renovation?

A house renovation brings an older or tired home up to date. It can include rewiring, a new heating system, replastering, new floors, windows, kitchens and bathrooms, and changes to the layout. A full renovation is often combined with an extension or loft conversion.
How much does a house renovation cost in Kidderminster?
In Kidderminster, a house renovation typically costs £850–£1,750 per m² for a medium to full renovation, including VAT at 20% (5% may apply to homes empty for two years or more). For a typical 90 m² project that is roughly £76,500–£157,500. Prices in the West Midlands sit near the national average for this kind of work, and the range for Kidderminster reflects that. Design, structural calculations and council fees are extra.
| Size or type | Guide range |
|---|---|
| Smaller project (63 m²) | £53,500–£110,000 |
| Typical project (90 m²) | £76,500–£157,500 |
| Larger project (126 m²) | £107,000–£220,500 |
| Rate per m² | £850–£1,750 |
What moves the price most:
- Structural and damp repairs
- Finishes
- Whether you live in during the work
- Extent of rewiring and replumbing
Use the guide price tool to see how size and specification change the figure, then ask for a written, itemised quote.
Do you need planning permission for a house renovation in Kidderminster?
The approval route for Kidderminster is set by planning law in England. In England internal renovation usually does not need planning permission unless the house is listed, when listed building consent covers internal work too. Notifiable work such as rewiring, structural changes, new windows and heating must meet building regulations.
Where work involves a shared wall, building on the boundary, or digging foundations within 3 metres of a neighbour’s building and deeper than its foundations (or within 6 metres for deeper work), the Party Wall etc. Act 1996 applies and notices must be served before work starts.
We check this for your address before design work starts, so there are no surprises later.
What we handle
The work we manage on a house renovation:
- Decoration
- Building control for notifiable work
- Structural repairs and damp treatment
- Kitchens and bathrooms
- Rewiring and heating upgrades
- Plastering and boarding
How long does it take?
Build time is typically 8 to 20 weeks on site depending on scope. Before that, surveys, drawings and approvals usually take 6 to 12 weeks, longer if the council asks for changes.
Building in Kidderminster
Across the West Midlands, inter-war and post-war semis make up much of the housing, giving good scope for two-storey side extensions and hip-to-gable lofts.
Projects in Kidderminster (DY10) are surveyed in person before we quote, so the price reflects your actual property.
How it works
- 01
Survey and brief
We visit, discuss your ideas and budget, and survey the property or site at no cost.
- 02
Design and fixed quote
Drawings, structural calculations and an itemised, fixed price for the agreed specification.
- 03
Approvals
Planning or permitted development confirmation, building regulations and any party wall matters.
- 04
Build and handover
Work follows the agreed programme, with inspections along the way and a completion certificate at the end.
Questions about house renovations in Kidderminster
Do you build house renovations in Kidderminster?
Yes. We build house renovations across Kidderminster, including postcodes DY10. Every project starts with a free home visit.
Is VAT reduced on renovations?
Usually not; the standard 20% rate applies. A reduced 5% rate can apply when renovating a home that has been empty for at least two years.
How long does a full renovation take?
Typically 8 to 20 weeks on site depending on the size of the house and scope.
How much does a house renovation cost in Kidderminster?
In Kidderminster, a house renovation typically costs £850–£1,750 per m² for a medium to full renovation, including VAT at 20% (5% may apply to homes empty for two years or more). A typical 90 m² project comes to roughly £76,500–£157,500. Your fixed price depends on the survey and drawings.
Do I need planning permission to renovate?
Internal work usually does not need planning permission unless the house is listed. External changes may.