What is a house renovation?

A house renovation brings an older or tired home up to date. It can include rewiring, a new heating system, replastering, new floors, windows, kitchens and bathrooms, and changes to the layout. A full renovation is often combined with an extension or loft conversion.
How much does a house renovation cost in Leatherhead?
In Leatherhead, a house renovation typically costs £1,000–£2,000 per m² for a medium to full renovation, including VAT at 20% (5% may apply to homes empty for two years or more). For a typical 90 m² project that is roughly £90,000–£180,000. Building costs in the South East run about 12% above the UK average, and the figures for Leatherhead are adjusted to reflect that. Design, structural calculations and council fees are extra.
| Size or type | Guide range |
|---|---|
| Smaller project (63 m²) | £63,000–£126,000 |
| Typical project (90 m²) | £90,000–£180,000 |
| Larger project (126 m²) | £126,000–£252,000 |
| Rate per m² | £1,000–£2,000 |
Your quote will depend mainly on:
- Windows and doors
- Whether you live in during the work
- Extent of rewiring and replumbing
- Finishes
Your exact price depends on the survey and drawings. The guide price tool gives a quick range in the meantime.
Do you need planning permission for a house renovation in Leatherhead?
Whether you need planning permission depends on your house and its location in England. In England internal renovation usually does not need planning permission unless the house is listed, when listed building consent covers internal work too. Notifiable work such as rewiring, structural changes, new windows and heating must meet building regulations.
Where work involves a shared wall, building on the boundary, or digging foundations within 3 metres of a neighbour’s building and deeper than its foundations (or within 6 metres for deeper work), the Party Wall etc. Act 1996 applies and notices must be served before work starts.
If the answer is not clear-cut, we can apply for formal confirmation before you commit to the build.
What we handle
On a typical house renovation we handle:
- Condition survey and scope of works
- Building control for notifiable work
- Decoration
- Plastering and boarding
- Kitchens and bathrooms
- Rewiring and heating upgrades
How long does it take?
Allow 8 to 20 weeks on site depending on scope. Design and approvals come first and typically take 6 to 12 weeks, depending on the approval route.
Building in Leatherhead
The South East has a broad mix of housing, from Victorian terraces in the towns to post-war semis and newer estates, so extension types vary street by street.
We work across Leatherhead and neighbouring areas such as Epsom, Ewell and Esher. Postcodes we cover in Leatherhead include KT22.
How it works
- 01
Visit and measured survey
A free visit to understand the project, check access and take measurements.
- 02
Design and fixed quote
Drawings, structural calculations and an itemised, fixed price for the agreed specification.
- 03
Permissions sorted
Applications, building control and neighbour arrangements, all before the start date.
- 04
Build and sign-off
We run the build to a written programme and hand over the completion certificate.
Questions about house renovations in Leatherhead
Do you renovate listed buildings?
Yes, with listed building consent and appropriate materials.
Does a renovation need building regulations approval?
Some parts do, such as rewiring, structural changes, new windows and heating systems. We handle notifications.
How much does a house renovation cost in Leatherhead?
In Leatherhead, a house renovation typically costs £1,000–£2,000 per m² for a medium to full renovation, including VAT at 20% (5% may apply to homes empty for two years or more). A typical 90 m² project comes to roughly £90,000–£180,000. Your fixed price depends on the survey and drawings.
Who approves a house renovation in Leatherhead?
Planning matters in Leatherhead go to the council covering your address, and the work needs building control approval. We prepare and submit the applications for you.
How long does a full renovation take?
Typically 8 to 20 weeks on site depending on the size of the house and scope.