What is a house renovation?

A house renovation brings an older or tired home up to date. It can include rewiring, a new heating system, replastering, new floors, windows, kitchens and bathrooms, and changes to the layout. A full renovation is often combined with an extension or loft conversion.
How much does a house renovation cost in Morecambe?
In Morecambe, a house renovation typically costs £850–£1,700 per m² for a medium to full renovation, including VAT at 20% (5% may apply to homes empty for two years or more). For a typical 90 m² project that is roughly £76,500–£153,000. Prices across the North West are typically 6% below the UK average for this kind of work, which is reflected in the range for Morecambe. Design, structural calculations and council fees are extra.
| Size or type | Guide range |
|---|---|
| Smaller project (63 m²) | £53,500–£107,000 |
| Typical project (90 m²) | £76,500–£153,000 |
| Larger project (126 m²) | £107,000–£214,000 |
| Rate per m² | £850–£1,700 |
The biggest cost drivers are:
- Windows and doors
- Extent of rewiring and replumbing
- Structural and damp repairs
- Kitchens and bathrooms
Use the guide price tool to see how size and specification change the figure, then ask for a written, itemised quote.
Do you need planning permission for a house renovation in Morecambe?
Approvals for a house renovation in Morecambe follow the rules for England. In England internal renovation usually does not need planning permission unless the house is listed, when listed building consent covers internal work too. Notifiable work such as rewiring, structural changes, new windows and heating must meet building regulations.
Building regulations approval comes from the council’s building control service or a registered building control approver. The work is inspected at key stages, such as foundations, drainage and insulation, and a completion certificate is issued at the end.
At the survey we check your house’s planning history and any restrictions, and tell you which route applies.
What we handle
Handled as part of most house renovations:
- Kitchens and bathrooms
- Decoration
- Rewiring and heating upgrades
- Structural repairs and damp treatment
- Condition survey and scope of works
- Joinery, doors and floors
How long does it take?
Allow 8 to 20 weeks on site depending on scope. Before that, surveys, drawings and approvals usually take 6 to 12 weeks, longer if the council asks for changes.
Building in Morecambe
The North West has many brick terraces and inter-war semis, where kitchen extensions and dormer loft conversions add space without moving.
From LA4 outwards, we take on projects throughout Morecambe and the surrounding parts of Lancashire.
How it works
- 01
Visit and measured survey
A free visit to understand the project, check access and take measurements.
- 02
Design and pricing
Design options, then a fixed quote based on the chosen drawings and specification.
- 03
Approvals
Planning or permitted development confirmation, building regulations and any party wall matters.
- 04
Build and sign-off
We run the build to a written programme and hand over the completion certificate.
Questions about house renovations in Morecambe
How long does a house renovation take in Morecambe?
Typically 8 to 20 weeks on site depending on scope. Design and approvals beforehand usually take 6 to 12 weeks.
Do you renovate listed buildings?
Yes, with listed building consent and appropriate materials.
Can I live in the house during a renovation?
For light work, yes. For a full renovation, most clients move out for some or all of the job.
How much does a house renovation cost in Morecambe?
In Morecambe, a house renovation typically costs £850–£1,700 per m² for a medium to full renovation, including VAT at 20% (5% may apply to homes empty for two years or more). A typical 90 m² project comes to roughly £76,500–£153,000. Your fixed price depends on the survey and drawings.
Is VAT reduced on renovations?
Usually not; the standard 20% rate applies. A reduced 5% rate can apply when renovating a home that has been empty for at least two years.