What is a house renovation?

A house renovation brings an older or tired home up to date. It can include rewiring, a new heating system, replastering, new floors, windows, kitchens and bathrooms, and changes to the layout. A full renovation is often combined with an extension or loft conversion.
How much does a house renovation cost in Saddleworth?
In Saddleworth, a house renovation typically costs £850–£1,700 per m² for a medium to full renovation, including VAT at 20% (5% may apply to homes empty for two years or more). For a typical 90 m² project that is roughly £76,500–£153,000. Prices across the North West are typically 6% below the UK average for this kind of work, which is reflected in the range for Saddleworth. Design, structural calculations and council fees are extra.
| Size or type | Guide range |
|---|---|
| Smaller project (63 m²) | £53,500–£107,000 |
| Typical project (90 m²) | £76,500–£153,000 |
| Larger project (126 m²) | £107,000–£214,000 |
| Rate per m² | £850–£1,700 |
What moves the price most:
- Finishes
- Whether you live in during the work
- Extent of rewiring and replumbing
- Kitchens and bathrooms
A guide range is only a starting point: the guide price tool gives an instant figure for your size, and a free survey turns it into a fixed quote.
Do you need planning permission for a house renovation in Saddleworth?
Approvals for a house renovation in Saddleworth follow the rules for England. In England internal renovation usually does not need planning permission unless the house is listed, when listed building consent covers internal work too. Notifiable work such as rewiring, structural changes, new windows and heating must meet building regulations.
Building regulations approval comes from the council’s building control service or a registered building control approver. The work is inspected at key stages, such as foundations, drainage and insulation, and a completion certificate is issued at the end.
At the survey we check your house’s planning history and any restrictions, and tell you which route applies.
What we handle
On a typical house renovation we handle:
- Kitchens and bathrooms
- Joinery, doors and floors
- Decoration
- Condition survey and scope of works
- Rewiring and heating upgrades
- Building control for notifiable work
How long does it take?
The build itself usually takes 8 to 20 weeks on site depending on scope. Design and approvals come first and typically take 6 to 12 weeks, depending on the approval route.
Building in Saddleworth
Terraced streets across the North West often suit rear dormers and single-storey kitchen extensions.
If your home is in Saddleworth or close by in Oldham, Stalybridge and Royton, a free home visit is the first step.
How it works
- 01
Survey and brief
We visit, discuss your ideas and budget, and survey the property or site at no cost.
- 02
Design and pricing
Design options, then a fixed quote based on the chosen drawings and specification.
- 03
Approvals in place
We handle planning, building control and neighbour notices before work starts.
- 04
Build and handover
Work follows the agreed programme, with inspections along the way and a completion certificate at the end.
Questions about house renovations in Saddleworth
How long does a house renovation take in Saddleworth?
Typically 8 to 20 weeks on site depending on scope. Design and approvals beforehand usually take 6 to 12 weeks.
Do you renovate listed buildings?
Yes, with listed building consent and appropriate materials.
Is VAT reduced on renovations?
Usually not; the standard 20% rate applies. A reduced 5% rate can apply when renovating a home that has been empty for at least two years.
How much does a house renovation cost in Saddleworth?
In Saddleworth, a house renovation typically costs £850–£1,700 per m² for a medium to full renovation, including VAT at 20% (5% may apply to homes empty for two years or more). A typical 90 m² project comes to roughly £76,500–£153,000. Your fixed price depends on the survey and drawings.
Can I live in the house during a renovation?
For light work, yes. For a full renovation, most clients move out for some or all of the job.
