What is a house renovation?

A house renovation brings an older or tired home up to date. It can include rewiring, a new heating system, replastering, new floors, windows, kitchens and bathrooms, and changes to the layout. A full renovation is often combined with an extension or loft conversion.
How much does a house renovation cost in Stowmarket?
In Stowmarket, a house renovation typically costs £950–£1,900 per m² for a medium to full renovation, including VAT at 20% (5% may apply to homes empty for two years or more). For a typical 90 m² project that is roughly £85,500–£171,000. Prices across the East of England are typically 6% above the UK average for this kind of work, which is reflected in the range for Stowmarket. Design, structural calculations and council fees are extra.
| Size or type | Guide range |
|---|---|
| Smaller project (63 m²) | £60,000–£119,500 |
| Typical project (90 m²) | £85,500–£171,000 |
| Larger project (126 m²) | £119,500–£239,500 |
| Rate per m² | £950–£1,900 |
Your quote will depend mainly on:
- Finishes
- Kitchens and bathrooms
- Whether you live in during the work
- Extent of rewiring and replumbing
A guide range is only a starting point: the guide price tool gives an instant figure for your size, and a free survey turns it into a fixed quote.
Do you need planning permission for a house renovation in Stowmarket?
The approval route for Stowmarket is set by planning law in England. In England internal renovation usually does not need planning permission unless the house is listed, when listed building consent covers internal work too. Notifiable work such as rewiring, structural changes, new windows and heating must meet building regulations.
Building regulations approval comes from the council’s building control service or a registered building control approver. The work is inspected at key stages, such as foundations, drainage and insulation, and a completion certificate is issued at the end.
We check this for your address before design work starts, so there are no surprises later.
What we handle
On a typical house renovation we handle:
- Decoration
- Condition survey and scope of works
- Structural repairs and damp treatment
- Building control for notifiable work
- Joinery, doors and floors
- Kitchens and bathrooms
How long does it take?
The build itself usually takes 8 to 20 weeks on site depending on scope. Allow time beforehand for drawings and approvals, usually 6 to 12 weeks.
Building in Stowmarket
Across the East of England, 1930s and post-war semis, newer estates and rural cottages all feature, each with different extension and loft options.
We work across Stowmarket and neighbouring areas such as Ipswich, Bury St Edmunds and Sudbury. Postcodes we cover in Stowmarket include IP14.
How it works
- 01
Visit and measured survey
A free visit to understand the project, check access and take measurements.
- 02
Design and fixed quote
Drawings, structural calculations and an itemised, fixed price for the agreed specification.
- 03
Approvals in place
We handle planning, building control and neighbour notices before work starts.
- 04
Construction and completion
We build, put right any snags and hand over the building control certificate.
Questions about house renovations in Stowmarket
Is VAT reduced on renovations?
Usually not; the standard 20% rate applies. A reduced 5% rate can apply when renovating a home that has been empty for at least two years.
Do I need planning permission to renovate?
Internal work usually does not need planning permission unless the house is listed. External changes may.
Do you renovate listed buildings?
Yes, with listed building consent and appropriate materials.
How much does a house renovation cost in Stowmarket?
In Stowmarket, a house renovation typically costs £950–£1,900 per m² for a medium to full renovation, including VAT at 20% (5% may apply to homes empty for two years or more). A typical 90 m² project comes to roughly £85,500–£171,000. Your fixed price depends on the survey and drawings.
How long does a house renovation take in Stowmarket?
Typically 8 to 20 weeks on site depending on scope. Design and approvals beforehand usually take 6 to 12 weeks.