What is a house renovation?

A house renovation brings an older or tired home up to date. It can include rewiring, a new heating system, replastering, new floors, windows, kitchens and bathrooms, and changes to the layout. A full renovation is often combined with an extension or loft conversion.
How much does a house renovation cost in Swanley?
In Swanley, a house renovation typically costs £1,000–£2,000 per m² for a medium to full renovation, including VAT at 20% (5% may apply to homes empty for two years or more). For a typical 90 m² project that is roughly £90,000–£180,000. We start from a UK-wide guide and adjust it for the South East, where labour and materials are typically about 12% above average. Design, structural calculations and council fees are extra.
| Size or type | Guide range |
|---|---|
| Smaller project (63 m²) | £63,000–£126,000 |
| Typical project (90 m²) | £90,000–£180,000 |
| Larger project (126 m²) | £126,000–£252,000 |
| Rate per m² | £1,000–£2,000 |
The biggest cost drivers are:
- Windows and doors
- Whether you live in during the work
- Structural and damp repairs
- Extent of rewiring and replumbing
Use the guide price tool to see how size and specification change the figure, then ask for a written, itemised quote.
Do you need planning permission for a house renovation in Swanley?
Approvals for a house renovation in Swanley follow the rules for England. In England internal renovation usually does not need planning permission unless the house is listed, when listed building consent covers internal work too. Notifiable work such as rewiring, structural changes, new windows and heating must meet building regulations.
Where work involves a shared wall, building on the boundary, or digging foundations within 3 metres of a neighbour’s building and deeper than its foundations (or within 6 metres for deeper work), the Party Wall etc. Act 1996 applies and notices must be served before work starts.
At the survey we check your house’s planning history and any restrictions, and tell you which route applies.
What we handle
Handled as part of most house renovations:
- Joinery, doors and floors
- Plastering and boarding
- Kitchens and bathrooms
- Condition survey and scope of works
- Rewiring and heating upgrades
- Building control for notifiable work
How long does it take?
Allow 8 to 20 weeks on site depending on scope. Design and approvals come first and typically take 6 to 12 weeks, depending on the approval route.
Building in Swanley
Commuter towns across the South East have many 1930s and post-war semis that suit rear extensions and hip-to-gable loft conversions.
Swanley sits in Kent, about 17 miles north-west of Maidstone. We cover the whole of Swanley, including postcodes BR8.
How it works
- 01
Survey and brief
We visit, discuss your ideas and budget, and survey the property or site at no cost.
- 02
Design and fixed quote
Drawings, structural calculations and an itemised, fixed price for the agreed specification.
- 03
Approvals
Planning or permitted development confirmation, building regulations and any party wall matters.
- 04
Build and sign-off
We run the build to a written programme and hand over the completion certificate.
Questions about house renovations in Swanley
Does a renovation need building regulations approval?
Some parts do, such as rewiring, structural changes, new windows and heating systems. We handle notifications.
How much does a house renovation cost in Swanley?
In Swanley, a house renovation typically costs £1,000–£2,000 per m² for a medium to full renovation, including VAT at 20% (5% may apply to homes empty for two years or more). A typical 90 m² project comes to roughly £90,000–£180,000. Your fixed price depends on the survey and drawings.
Do you renovate listed buildings?
Yes, with listed building consent and appropriate materials.
Who approves a house renovation in Swanley?
Planning matters in Swanley go to the council covering your address, and the work needs building control approval. We prepare and submit the applications for you.
How long does a full renovation take?
Typically 8 to 20 weeks on site depending on the size of the house and scope.