What is a house renovation?

A house renovation brings an older or tired home up to date. It can include rewiring, a new heating system, replastering, new floors, windows, kitchens and bathrooms, and changes to the layout. A full renovation is often combined with an extension or loft conversion.
How much does a house renovation cost in Yate?
In Yate, a house renovation typically costs £900–£1,850 per m² for a medium to full renovation, including VAT at 20% (5% may apply to homes empty for two years or more). For a typical 90 m² project that is roughly £81,000–£166,500. Prices in the South West sit near the national average for this kind of work, and the range for Yate reflects that. Design, structural calculations and council fees are extra.
| Size or type | Guide range |
|---|---|
| Smaller project (63 m²) | £56,500–£116,500 |
| Typical project (90 m²) | £81,000–£166,500 |
| Larger project (126 m²) | £113,500–£233,000 |
| Rate per m² | £900–£1,850 |
The main things that change the cost:
- Whether you live in during the work
- Windows and doors
- Finishes
- Structural and damp repairs
For a figure based on your own measurements, try the guide price tool, then book a free home visit for a fixed quote.
Do you need planning permission for a house renovation in Yate?
Here is how the rules work for a house renovation in England. In England internal renovation usually does not need planning permission unless the house is listed, when listed building consent covers internal work too. Notifiable work such as rewiring, structural changes, new windows and heating must meet building regulations.
Building regulations approval comes from the council’s building control service or a registered building control approver. The work is inspected at key stages, such as foundations, drainage and insulation, and a completion certificate is issued at the end.
If the answer is not clear-cut, we can apply for formal confirmation before you commit to the build.
What we handle
What we take care of:
- Plastering and boarding
- Rewiring and heating upgrades
- Joinery, doors and floors
- Kitchens and bathrooms
- Structural repairs and damp treatment
- Building control for notifiable work
How long does it take?
Build time is typically 8 to 20 weeks on site depending on scope. Design and approvals come first and typically take 6 to 12 weeks, depending on the approval route.
Building in Yate
The South West mixes stone and render cottages with post-war and newer estates, and local materials matter more here when matching an extension.
If your home is in Yate or close by in Mangotsfield, Kingswood and Keynsham, a free home visit is the first step.
How it works
- 01
Visit and measured survey
A free visit to understand the project, check access and take measurements.
- 02
Drawings and written quote
We prepare the design and give you a written, itemised quote with inclusions and exclusions.
- 03
Permissions sorted
Applications, building control and neighbour arrangements, all before the start date.
- 04
Build and handover
Work follows the agreed programme, with inspections along the way and a completion certificate at the end.
Questions about house renovations in Yate
How much does a house renovation cost in Yate?
In Yate, a house renovation typically costs £900–£1,850 per m² for a medium to full renovation, including VAT at 20% (5% may apply to homes empty for two years or more). A typical 90 m² project comes to roughly £81,000–£166,500. Your fixed price depends on the survey and drawings.
Does a renovation need building regulations approval?
Some parts do, such as rewiring, structural changes, new windows and heating systems. We handle notifications.
Can I live in the house during a renovation?
For light work, yes. For a full renovation, most clients move out for some or all of the job.
Do I need planning permission to renovate?
Internal work usually does not need planning permission unless the house is listed. External changes may.
How long does a house renovation take in Yate?
Typically 8 to 20 weeks on site depending on scope. Design and approvals beforehand usually take 6 to 12 weeks.
