What is a kitchen extension?

A kitchen extension is an extension designed around a new kitchen, usually an open-plan kitchen, dining and family space at the back of the house. We build the extension and fit the kitchen as one project, so plumbing, electrics and lighting are planned around the layout from the start.
How much does a kitchen extension cost in Barking?
In Barking, a kitchen extension typically costs £2,900–£4,400 per m² including a mid-range kitchen, including VAT at 20% (standard rate). For a typical 22 m² project that is roughly £64,000–£97,000. Building costs in London run about 30% above the UK average, and the figures for Barking are adjusted to reflect that. Design, structural calculations and council fees are extra.
| Size or type | Guide range |
|---|---|
| Smaller project (15 m²) | £43,500–£66,000 |
| Typical project (22 m²) | £64,000–£97,000 |
| Larger project (31 m²) | £90,000–£136,500 |
| Rate per m² | £2,900–£4,400 |
The main things that change the cost:
- Extension size and roof design
- Underfloor heating and flooring
- Glazing and roof lanterns
- Who supplies the kitchen
Use the guide price tool to see how size and specification change the figure, then ask for a written, itemised quote.
Do you need planning permission for a kitchen extension in Barking?
Before anything is built in Barking, we confirm which approvals apply in England. In England a single-storey rear extension is often permitted development: broadly up to 3 metres deep on a semi-detached or terraced house and 4 metres on a detached house, no higher than 4 metres, with eaves no higher than 3 metres within 2 metres of a boundary, and covering no more than half the garden. The larger home extension scheme allows up to 6 or 8 metres if you notify the council first and neighbours have a chance to comment. In conservation areas, National Parks and National Landscapes the larger home extension route, side extensions and cladding are not permitted development. Flats and houses whose rights have been removed need a planning application, and listed buildings need listed building consent.
Where work involves a shared wall, building on the boundary, or digging foundations within 3 metres of a neighbour’s building and deeper than its foundations (or within 6 metres for deeper work), the Party Wall etc. Act 1996 applies and notices must be served before work starts.
At the survey we check your house’s planning history and any restrictions, and tell you which route applies.
What we handle
Handled as part of most kitchen extensions:
- Kitchen fitting, worktops and splashbacks
- Kitchen layout planned alongside the extension design
- Extraction ducted to outside
- Building control sign-off
- Electrics, lighting plan and sockets
- Extension structure, roof and glazing
How long does it take?
The build itself usually takes 11 to 16 weeks on site, including kitchen fitting. Allow time beforehand for drawings and approvals, usually 6 to 12 weeks.
Building in Barking
Space is at a premium in London, so homeowners often build out into the side return or up into the roof rather than move.
If your home is in Barking or close by in East Ham, Woolwich and Ilford, a free home visit is the first step.
How it works
- 01
Visit and measured survey
A free visit to understand the project, check access and take measurements.
- 02
Design and pricing
Design options, then a fixed quote based on the chosen drawings and specification.
- 03
Permissions sorted
Applications, building control and neighbour arrangements, all before the start date.
- 04
Construction and completion
We build, put right any snags and hand over the building control certificate.
Questions about kitchen extensions in Barking
How much does a kitchen extension cost in Barking?
In Barking, a kitchen extension typically costs £2,900–£4,400 per m² including a mid-range kitchen, including VAT at 20% (standard rate). A typical 22 m² project comes to roughly £64,000–£97,000. Your fixed price depends on the survey and drawings.
How long will I be without a kitchen?
Usually 3 to 6 weeks at the end of the job, once the back wall is opened and the new kitchen goes in. We can help set up a temporary kitchen.
Do I need extraction to outside?
Building regulations require kitchen extract ventilation. Ducting to an outside wall is the most effective option and is planned during the build.
Should the kitchen be designed before the extension?
Yes. Knowing where the sink, hob and island will go lets us place drains, ducting, sockets and windows correctly during the build.
Who approves a kitchen extension in Barking?
Planning matters in Barking go to the council covering your address, and the work needs building control approval. We prepare and submit the applications for you.