What is a kitchen extension?

A kitchen extension is an extension designed around a new kitchen, usually an open-plan kitchen, dining and family space at the back of the house. We build the extension and fit the kitchen as one project, so plumbing, electrics and lighting are planned around the layout from the start.
How much does a kitchen extension cost in Bermondsey?
In Bermondsey, a kitchen extension typically costs £2,900–£4,400 per m² including a mid-range kitchen, including VAT at 20% (standard rate). For a typical 22 m² project that is roughly £64,000–£97,000. That range is adjusted for London, where domestic building work typically costs around 30% above the national average. Design, structural calculations and council fees are extra.
| Size or type | Guide range |
|---|---|
| Smaller project (15 m²) | £43,500–£66,000 |
| Typical project (22 m²) | £64,000–£97,000 |
| Larger project (31 m²) | £90,000–£136,500 |
| Rate per m² | £2,900–£4,400 |
What moves the price most:
- Who supplies the kitchen
- Extension size and roof design
- Island with sink or hob, which needs services in the floor
- Glazing and roof lanterns
For a figure based on your own measurements, try the guide price tool, then book a free home visit for a fixed quote.
Do you need planning permission for a kitchen extension in Bermondsey?
Here is how the rules work for a kitchen extension in England. In England a single-storey rear extension is often permitted development: broadly up to 3 metres deep on a semi-detached or terraced house and 4 metres on a detached house, no higher than 4 metres, with eaves no higher than 3 metres within 2 metres of a boundary, and covering no more than half the garden. The larger home extension scheme allows up to 6 or 8 metres if you notify the council first and neighbours have a chance to comment. In conservation areas, National Parks and National Landscapes the larger home extension route, side extensions and cladding are not permitted development. Flats and houses whose rights have been removed need a planning application, and listed buildings need listed building consent.
Where work involves a shared wall, building on the boundary, or digging foundations within 3 metres of a neighbour’s building and deeper than its foundations (or within 6 metres for deeper work), the Party Wall etc. Act 1996 applies and notices must be served before work starts.
We check this for your address before design work starts, so there are no surprises later.
What we handle
Handled as part of most kitchen extensions:
- Electrics, lighting plan and sockets
- Kitchen fitting, worktops and splashbacks
- Flooring and decoration
- Kitchen layout planned alongside the extension design
- Extension structure, roof and glazing
- Extraction ducted to outside
How long does it take?
Allow 11 to 16 weeks on site, including kitchen fitting. Before that, surveys, drawings and approvals usually take 6 to 12 weeks, longer if the council asks for changes.
Building in Bermondsey
Space is at a premium in London, so homeowners often build out into the side return or up into the roof rather than move.
From SE1 outwards, we take on projects throughout Bermondsey and the surrounding parts of Greater London.
How it works
- 01
Visit and measured survey
A free visit to understand the project, check access and take measurements.
- 02
Design and fixed quote
Drawings, structural calculations and an itemised, fixed price for the agreed specification.
- 03
Approvals
Planning or permitted development confirmation, building regulations and any party wall matters.
- 04
Construction and completion
We build, put right any snags and hand over the building control certificate.
Questions about kitchen extensions in Bermondsey
How much does a kitchen extension cost in Bermondsey?
In Bermondsey, a kitchen extension typically costs £2,900–£4,400 per m² including a mid-range kitchen, including VAT at 20% (standard rate). A typical 22 m² project comes to roughly £64,000–£97,000. Your fixed price depends on the survey and drawings.
How long will I be without a kitchen?
Usually 3 to 6 weeks at the end of the job, once the back wall is opened and the new kitchen goes in. We can help set up a temporary kitchen.
Should the kitchen be designed before the extension?
Yes. Knowing where the sink, hob and island will go lets us place drains, ducting, sockets and windows correctly during the build.
Is underfloor heating worth it?
In a large open-plan space it frees wall space for units and glazing and gives even heat. It is easiest to fit during the build.
Who approves a kitchen extension in Bermondsey?
Planning matters in Bermondsey go to the council covering your address, and the work needs building control approval. We prepare and submit the applications for you.
