What is a kitchen extension?

A kitchen extension is an extension designed around a new kitchen, usually an open-plan kitchen, dining and family space at the back of the house. We build the extension and fit the kitchen as one project, so plumbing, electrics and lighting are planned around the layout from the start.
How much does a kitchen extension cost in Buckley?
In Buckley, a kitchen extension typically costs £2,050–£3,150 per m² including a mid-range kitchen, including VAT at 20% (standard rate). For a typical 22 m² project that is roughly £45,000–£69,500. Building costs in Wales run about 8% below the UK average, and the figures for Buckley are adjusted to reflect that. Design, structural calculations and council fees are extra.
| Size or type | Guide range |
|---|---|
| Smaller project (15 m²) | £31,000–£47,000 |
| Typical project (22 m²) | £45,000–£69,500 |
| Larger project (31 m²) | £63,500–£97,500 |
| Rate per m² | £2,050–£3,150 |
The biggest cost drivers are:
- Who supplies the kitchen
- Glazing and roof lanterns
- Extension size and roof design
- Kitchen units, worktops and appliances
A guide range is only a starting point: the guide price tool gives an instant figure for your size, and a free survey turns it into a fixed quote.
Do you need planning permission for a kitchen extension in Buckley?
Before anything is built in Buckley, we confirm which approvals apply in Wales. In Wales a single-storey rear extension is often permitted development: up to 4 metres beyond the rear wall and up to 4 metres high, with eaves no higher than 3 metres within 2 metres of a boundary and no more than half the land around the original house covered. Wales has no larger home extension prior approval route, so deeper extensions need a planning application, as do extensions to flats, listed buildings and houses whose rights have been removed.
Building regulations in Wales are set by the Welsh Government. Approval comes from the council’s building control service or a registered building control approver, with inspections during the work and a completion certificate at the end.
At the survey we check your house’s planning history and any restrictions, and tell you which route applies.
What we handle
The work we manage on a kitchen extension:
- Electrics, lighting plan and sockets
- Kitchen fitting, worktops and splashbacks
- Extraction ducted to outside
- Extension structure, roof and glazing
- Kitchen layout planned alongside the extension design
- Flooring and decoration
How long does it take?
Allow 11 to 16 weeks on site, including kitchen fitting. Design and approvals come first and typically take 6 to 12 weeks, depending on the approval route.
Building in Buckley
Terraced houses in Welsh towns often have narrow plots, which suits rear and side return extensions and rear dormers.
We work across Buckley and neighbouring areas such as Hawarden, Deeside and Flint. Postcodes we cover in Buckley include CH7.
How it works
- 01
Visit and measured survey
A free visit to understand the project, check access and take measurements.
- 02
Design and pricing
Design options, then a fixed quote based on the chosen drawings and specification.
- 03
Approvals
Planning or permitted development confirmation, building regulations and any party wall matters.
- 04
Construction and completion
We build, put right any snags and hand over the building control certificate.
Questions about kitchen extensions in Buckley
Should the kitchen be designed before the extension?
Yes. Knowing where the sink, hob and island will go lets us place drains, ducting, sockets and windows correctly during the build.
Do I need extraction to outside?
Building regulations require kitchen extract ventilation. Ducting to an outside wall is the most effective option and is planned during the build.
How much does a kitchen extension cost in Buckley?
In Buckley, a kitchen extension typically costs £2,050–£3,150 per m² including a mid-range kitchen, including VAT at 20% (standard rate). A typical 22 m² project comes to roughly £45,000–£69,500. Your fixed price depends on the survey and drawings.
How long does a kitchen extension take in Buckley?
Typically 11 to 16 weeks on site, including kitchen fitting. Design and approvals beforehand usually take 6 to 12 weeks.
Do I need planning permission for a kitchen extension in Buckley?
In Wales a single-storey rear extension is often permitted development: up to 4 metres beyond the rear wall and up to 4 metres high, with eaves no higher than 3 metres within 2 metres of a boundary and no more than half the land around the original house covered. Wales has no larger home extension prior approval route, so deeper extensions need a planning application, as do extensions to flats, listed buildings and houses whose rights have been removed.
Is underfloor heating worth it?
In a large open-plan space it frees wall space for units and glazing and gives even heat. It is easiest to fit during the build.
