What is a kitchen extension?

A kitchen extension is an extension designed around a new kitchen, usually an open-plan kitchen, dining and family space at the back of the house. We build the extension and fit the kitchen as one project, so plumbing, electrics and lighting are planned around the layout from the start.
How much does a kitchen extension cost in Hertford?
In Hertford, a kitchen extension typically costs £2,400–£3,600 per m² including a mid-range kitchen, including VAT at 20% (standard rate). For a typical 22 m² project that is roughly £53,000–£79,000. The guide for Hertford reflects typical costs in the East of England, roughly 6% above the UK-wide figure. Design, structural calculations and council fees are extra.
| Size or type | Guide range |
|---|---|
| Smaller project (15 m²) | £36,000–£54,000 |
| Typical project (22 m²) | £53,000–£79,000 |
| Larger project (31 m²) | £74,500–£111,500 |
| Rate per m² | £2,400–£3,600 |
The main things that change the cost:
- Who supplies the kitchen
- Kitchen units, worktops and appliances
- Island with sink or hob, which needs services in the floor
- Glazing and roof lanterns
Your exact price depends on the survey and drawings. The guide price tool gives a quick range in the meantime.
Do you need planning permission for a kitchen extension in Hertford?
The approval route for Hertford is set by planning law in England. In England a single-storey rear extension is often permitted development: broadly up to 3 metres deep on a semi-detached or terraced house and 4 metres on a detached house, no higher than 4 metres, with eaves no higher than 3 metres within 2 metres of a boundary, and covering no more than half the garden. The larger home extension scheme allows up to 6 or 8 metres if you notify the council first and neighbours have a chance to comment. In conservation areas, National Parks and National Landscapes the larger home extension route, side extensions and cladding are not permitted development. Flats and houses whose rights have been removed need a planning application, and listed buildings need listed building consent.
Building regulations approval comes from the council’s building control service or a registered building control approver. The work is inspected at key stages, such as foundations, drainage and insulation, and a completion certificate is issued at the end.
If the answer is not clear-cut, we can apply for formal confirmation before you commit to the build.
What we handle
The work we manage on a kitchen extension:
- Building control sign-off
- Extraction ducted to outside
- Flooring and decoration
- Extension structure, roof and glazing
- Electrics, lighting plan and sockets
- Kitchen layout planned alongside the extension design
How long does it take?
Allow 11 to 16 weeks on site, including kitchen fitting. Allow time beforehand for drawings and approvals, usually 6 to 12 weeks.
Building in Hertford
Many towns in the East of England have estates built since the 1970s, where garage conversions and rear extensions are popular.
Hertford sits in Hertfordshire. We cover the whole of Hertford, including postcodes SG13.
How it works
- 01
Visit and measured survey
A free visit to understand the project, check access and take measurements.
- 02
Design and fixed quote
Drawings, structural calculations and an itemised, fixed price for the agreed specification.
- 03
Approvals
Planning or permitted development confirmation, building regulations and any party wall matters.
- 04
Construction and completion
We build, put right any snags and hand over the building control certificate.
Questions about kitchen extensions in Hertford
Can I buy my own kitchen?
Yes. You can supply it and we fit it, or we supply it as part of the price. Either way we coordinate deliveries with the build programme.
How much does a kitchen extension cost in Hertford?
In Hertford, a kitchen extension typically costs £2,400–£3,600 per m² including a mid-range kitchen, including VAT at 20% (standard rate). A typical 22 m² project comes to roughly £53,000–£79,000. Your fixed price depends on the survey and drawings.
Do I need extraction to outside?
Building regulations require kitchen extract ventilation. Ducting to an outside wall is the most effective option and is planned during the build.
Who approves a kitchen extension in Hertford?
Planning matters in Hertford go to the council covering your address, and the work needs building control approval. We prepare and submit the applications for you.
How long will I be without a kitchen?
Usually 3 to 6 weeks at the end of the job, once the back wall is opened and the new kitchen goes in. We can help set up a temporary kitchen.