What is a kitchen extension?

A kitchen extension is an extension designed around a new kitchen, usually an open-plan kitchen, dining and family space at the back of the house. We build the extension and fit the kitchen as one project, so plumbing, electrics and lighting are planned around the layout from the start.
How much does a kitchen extension cost in Hythe?
In Hythe, a kitchen extension typically costs £2,500–£3,800 per m² including a mid-range kitchen, including VAT at 20% (standard rate). For a typical 22 m² project that is roughly £55,000–£83,500. Building costs in the South East run about 12% above the UK average, and the figures for Hythe are adjusted to reflect that. Design, structural calculations and council fees are extra.
| Size or type | Guide range |
|---|---|
| Smaller project (15 m²) | £37,500–£57,000 |
| Typical project (22 m²) | £55,000–£83,500 |
| Larger project (31 m²) | £77,500–£118,000 |
| Rate per m² | £2,500–£3,800 |
The biggest cost drivers are:
- Extension size and roof design
- Island with sink or hob, which needs services in the floor
- Who supplies the kitchen
- Underfloor heating and flooring
Use the guide price tool to see how size and specification change the figure, then ask for a written, itemised quote.
Do you need planning permission for a kitchen extension in Hythe?
The approval route for Hythe is set by planning law in England. In England a single-storey rear extension is often permitted development: broadly up to 3 metres deep on a semi-detached or terraced house and 4 metres on a detached house, no higher than 4 metres, with eaves no higher than 3 metres within 2 metres of a boundary, and covering no more than half the garden. The larger home extension scheme allows up to 6 or 8 metres if you notify the council first and neighbours have a chance to comment. In conservation areas, National Parks and National Landscapes the larger home extension route, side extensions and cladding are not permitted development. Flats and houses whose rights have been removed need a planning application, and listed buildings need listed building consent.
Where work involves a shared wall, building on the boundary, or digging foundations within 3 metres of a neighbour’s building and deeper than its foundations (or within 6 metres for deeper work), the Party Wall etc. Act 1996 applies and notices must be served before work starts.
Our first visit includes a check of your planning history, so you know the route before paying for drawings.
What we handle
From survey to sign-off, the job normally involves:
- Electrics, lighting plan and sockets
- Kitchen layout planned alongside the extension design
- Flooring and decoration
- Extraction ducted to outside
- Drainage and water supply positioned for the sink and appliances
- Kitchen fitting, worktops and splashbacks
How long does it take?
Build time is typically 11 to 16 weeks on site, including kitchen fitting. Design and approvals come first and typically take 6 to 12 weeks, depending on the approval route.
Building in Hythe
Commuter towns across the South East have many 1930s and post-war semis that suit rear extensions and hip-to-gable loft conversions.
We work across Hythe and neighbouring areas such as Southampton, Totton and Eastleigh. Postcodes we cover in Hythe include SO45.
How it works
- 01
Visit and measured survey
A free visit to understand the project, check access and take measurements.
- 02
Drawings and written quote
We prepare the design and give you a written, itemised quote with inclusions and exclusions.
- 03
Approvals
Planning or permitted development confirmation, building regulations and any party wall matters.
- 04
Build and sign-off
We run the build to a written programme and hand over the completion certificate.
Questions about kitchen extensions in Hythe
Should the kitchen be designed before the extension?
Yes. Knowing where the sink, hob and island will go lets us place drains, ducting, sockets and windows correctly during the build.
How long will I be without a kitchen?
Usually 3 to 6 weeks at the end of the job, once the back wall is opened and the new kitchen goes in. We can help set up a temporary kitchen.
Do you build kitchen extensions in Hythe?
Yes. We build kitchen extensions across Hythe, including postcodes SO45. Every project starts with a free home visit.
How much does a kitchen extension cost in Hythe?
In Hythe, a kitchen extension typically costs £2,500–£3,800 per m² including a mid-range kitchen, including VAT at 20% (standard rate). A typical 22 m² project comes to roughly £55,000–£83,500. Your fixed price depends on the survey and drawings.
Is underfloor heating worth it?
In a large open-plan space it frees wall space for units and glazing and gives even heat. It is easiest to fit during the build.
