What is a kitchen extension?

A kitchen extension is an extension designed around a new kitchen, usually an open-plan kitchen, dining and family space at the back of the house. We build the extension and fit the kitchen as one project, so plumbing, electrics and lighting are planned around the layout from the start.
How much does a kitchen extension cost in Mid Glamorgan?
In Mid Glamorgan, a kitchen extension typically costs £2,050–£3,150 per m² including a mid-range kitchen, including VAT at 20% (standard rate). For a typical 22 m² project that is roughly £45,000–£69,500. We start from a UK-wide guide and adjust it for Wales, where labour and materials are typically about 8% below average. Design, structural calculations and council fees are extra.
| Size or type | Guide range |
|---|---|
| Smaller project (15 m²) | £31,000–£47,000 |
| Typical project (22 m²) | £45,000–£69,500 |
| Larger project (31 m²) | £63,500–£97,500 |
| Rate per m² | £2,050–£3,150 |
Your quote will depend mainly on:
- Glazing and roof lanterns
- Island with sink or hob, which needs services in the floor
- Extension size and roof design
- Kitchen units, worktops and appliances
Your exact price depends on the survey and drawings. The guide price tool gives a quick range in the meantime.
Do you need planning permission for a kitchen extension in Mid Glamorgan?
Before anything is built in Mid Glamorgan, we confirm which approvals apply in Wales. In Wales a single-storey rear extension is often permitted development: up to 4 metres beyond the rear wall and up to 4 metres high, with eaves no higher than 3 metres within 2 metres of a boundary and no more than half the land around the original house covered. Wales has no larger home extension prior approval route, so deeper extensions need a planning application, as do extensions to flats, listed buildings and houses whose rights have been removed.
Building regulations in Wales are set by the Welsh Government. Approval comes from the council’s building control service or a registered building control approver, with inspections during the work and a completion certificate at the end.
At the survey we check your house’s planning history and any restrictions, and tell you which route applies.
What we handle
From survey to sign-off, the job normally involves:
- Flooring and decoration
- Extraction ducted to outside
- Kitchen layout planned alongside the extension design
- Electrics, lighting plan and sockets
- Extension structure, roof and glazing
- Kitchen fitting, worktops and splashbacks
How long does it take?
Build time is typically 11 to 16 weeks on site, including kitchen fitting. Before that, surveys, drawings and approvals usually take 6 to 12 weeks, longer if the council asks for changes.
Building in Mid Glamorgan
Terraced houses in Welsh towns often have narrow plots, which suits rear and side return extensions and rear dormers.
Towns we cover in Mid Glamorgan include Bridgend, Merthyr Tydfil, Pontypridd, Aberdare, Caerphilly and Maesteg.
How it works
- 01
Survey and brief
We visit, discuss your ideas and budget, and survey the property or site at no cost.
- 02
Drawings and written quote
We prepare the design and give you a written, itemised quote with inclusions and exclusions.
- 03
Approvals
Planning or permitted development confirmation, building regulations and any party wall matters.
- 04
Construction and completion
We build, put right any snags and hand over the building control certificate.
Questions about kitchen extensions in Mid Glamorgan
How much does a kitchen extension cost in Mid Glamorgan?
In Mid Glamorgan, a kitchen extension typically costs £2,050–£3,150 per m² including a mid-range kitchen, including VAT at 20% (standard rate). A typical 22 m² project comes to roughly £45,000–£69,500. Your fixed price depends on the survey and drawings.
Do I need extraction to outside?
Building regulations require kitchen extract ventilation. Ducting to an outside wall is the most effective option and is planned during the build.
Should the kitchen be designed before the extension?
Yes. Knowing where the sink, hob and island will go lets us place drains, ducting, sockets and windows correctly during the build.
How long does a kitchen extension take in Mid Glamorgan?
Typically 11 to 16 weeks on site, including kitchen fitting. Design and approvals beforehand usually take 6 to 12 weeks.
Is underfloor heating worth it?
In a large open-plan space it frees wall space for units and glazing and gives even heat. It is easiest to fit during the build.
Do I need planning permission for a kitchen extension in Mid Glamorgan?
In Wales a single-storey rear extension is often permitted development: up to 4 metres beyond the rear wall and up to 4 metres high, with eaves no higher than 3 metres within 2 metres of a boundary and no more than half the land around the original house covered. Wales has no larger home extension prior approval route, so deeper extensions need a planning application, as do extensions to flats, listed buildings and houses whose rights have been removed.