What is a kitchen extension?

A kitchen extension is an extension designed around a new kitchen, usually an open-plan kitchen, dining and family space at the back of the house. We build the extension and fit the kitchen as one project, so plumbing, electrics and lighting are planned around the layout from the start.
How much does a kitchen extension cost in Morden?
In Morden, a kitchen extension typically costs £2,900–£4,400 per m² including a mid-range kitchen, including VAT at 20% (standard rate). For a typical 22 m² project that is roughly £64,000–£97,000. The guide for Morden reflects typical costs in London, roughly 30% above the UK-wide figure. Design, structural calculations and council fees are extra.
| Size or type | Guide range |
|---|---|
| Smaller project (15 m²) | £43,500–£66,000 |
| Typical project (22 m²) | £64,000–£97,000 |
| Larger project (31 m²) | £90,000–£136,500 |
| Rate per m² | £2,900–£4,400 |
What moves the price most:
- Extension size and roof design
- Island with sink or hob, which needs services in the floor
- Underfloor heating and flooring
- Glazing and roof lanterns
Use the guide price tool to see how size and specification change the figure, then ask for a written, itemised quote.
Do you need planning permission for a kitchen extension in Morden?
Before anything is built in Morden, we confirm which approvals apply in England. In England a single-storey rear extension is often permitted development: broadly up to 3 metres deep on a semi-detached or terraced house and 4 metres on a detached house, no higher than 4 metres, with eaves no higher than 3 metres within 2 metres of a boundary, and covering no more than half the garden. The larger home extension scheme allows up to 6 or 8 metres if you notify the council first and neighbours have a chance to comment. In conservation areas, National Parks and National Landscapes the larger home extension route, side extensions and cladding are not permitted development. Flats and houses whose rights have been removed need a planning application, and listed buildings need listed building consent.
Where work involves a shared wall, building on the boundary, or digging foundations within 3 metres of a neighbour’s building and deeper than its foundations (or within 6 metres for deeper work), the Party Wall etc. Act 1996 applies and notices must be served before work starts.
Our first visit includes a check of your planning history, so you know the route before paying for drawings.
What we handle
Handled as part of most kitchen extensions:
- Extension structure, roof and glazing
- Kitchen fitting, worktops and splashbacks
- Electrics, lighting plan and sockets
- Drainage and water supply positioned for the sink and appliances
- Building control sign-off
- Extraction ducted to outside
How long does it take?
Build time is typically 11 to 16 weeks on site, including kitchen fitting. Design and approvals come first and typically take 6 to 12 weeks, depending on the approval route.
Building in Morden
Many London boroughs have conservation areas and detailed design guides, so early design advice saves time at the planning stage.
Our Morden coverage includes postcode districts SM4, and we also work in nearby places such as Mitcham, Wimbledon and Tooting.
How it works
- 01
Free visit
We look at the property, talk through what you want and measure up. There is no charge and no obligation.
- 02
Drawings and written quote
We prepare the design and give you a written, itemised quote with inclusions and exclusions.
- 03
Approvals in place
We handle planning, building control and neighbour notices before work starts.
- 04
Build and sign-off
We run the build to a written programme and hand over the completion certificate.
Questions about kitchen extensions in Morden
How much does a kitchen extension cost in Morden?
In Morden, a kitchen extension typically costs £2,900–£4,400 per m² including a mid-range kitchen, including VAT at 20% (standard rate). A typical 22 m² project comes to roughly £64,000–£97,000. Your fixed price depends on the survey and drawings.
How long does a kitchen extension take in Morden?
Typically 11 to 16 weeks on site, including kitchen fitting. Design and approvals beforehand usually take 6 to 12 weeks.
Should the kitchen be designed before the extension?
Yes. Knowing where the sink, hob and island will go lets us place drains, ducting, sockets and windows correctly during the build.
Can I buy my own kitchen?
Yes. You can supply it and we fit it, or we supply it as part of the price. Either way we coordinate deliveries with the build programme.
Will I need planning permission?
The same rules apply as for any extension. Many single-storey kitchen extensions are permitted development; larger or wraparound designs need an application.