What is a kitchen extension?

A kitchen extension is an extension designed around a new kitchen, usually an open-plan kitchen, dining and family space at the back of the house. We build the extension and fit the kitchen as one project, so plumbing, electrics and lighting are planned around the layout from the start.
How much does a kitchen extension cost in Stamford?
In Stamford, a kitchen extension typically costs £2,150–£3,250 per m² including a mid-range kitchen, including VAT at 20% (standard rate). For a typical 22 m² project that is roughly £47,500–£71,500. We start from a UK-wide guide and adjust it for the East Midlands, where labour and materials are typically about 5% below average. Design, structural calculations and council fees are extra.
| Size or type | Guide range |
|---|---|
| Smaller project (15 m²) | £32,000–£49,000 |
| Typical project (22 m²) | £47,500–£71,500 |
| Larger project (31 m²) | £66,500–£101,000 |
| Rate per m² | £2,150–£3,250 |
Your quote will depend mainly on:
- Kitchen units, worktops and appliances
- Extension size and roof design
- Underfloor heating and flooring
- Who supplies the kitchen
For a figure based on your own measurements, try the guide price tool, then book a free home visit for a fixed quote.
Do you need planning permission for a kitchen extension in Stamford?
Whether you need planning permission depends on your house and its location in England. In England a single-storey rear extension is often permitted development: broadly up to 3 metres deep on a semi-detached or terraced house and 4 metres on a detached house, no higher than 4 metres, with eaves no higher than 3 metres within 2 metres of a boundary, and covering no more than half the garden. The larger home extension scheme allows up to 6 or 8 metres if you notify the council first and neighbours have a chance to comment. In conservation areas, National Parks and National Landscapes the larger home extension route, side extensions and cladding are not permitted development. Flats and houses whose rights have been removed need a planning application, and listed buildings need listed building consent.
Building regulations approval comes from the council’s building control service or a registered building control approver. The work is inspected at key stages, such as foundations, drainage and insulation, and a completion certificate is issued at the end.
Our first visit includes a check of your planning history, so you know the route before paying for drawings.
What we handle
The work we manage on a kitchen extension:
- Drainage and water supply positioned for the sink and appliances
- Flooring and decoration
- Kitchen layout planned alongside the extension design
- Building control sign-off
- Kitchen fitting, worktops and splashbacks
- Extraction ducted to outside
How long does it take?
The build itself usually takes 11 to 16 weeks on site, including kitchen fitting. Before that, surveys, drawings and approvals usually take 6 to 12 weeks, longer if the council asks for changes.
Building in Stamford
In the East Midlands, many estates built since the 1960s have integral garages that convert well into a study or bedroom.
Our Stamford coverage includes postcode districts PE9, and we also work in nearby places such as Oakham, Peterborough and Corby.
How it works
- 01
Survey and brief
We visit, discuss your ideas and budget, and survey the property or site at no cost.
- 02
Design and pricing
Design options, then a fixed quote based on the chosen drawings and specification.
- 03
Approvals
Planning or permitted development confirmation, building regulations and any party wall matters.
- 04
Build and sign-off
We run the build to a written programme and hand over the completion certificate.
Questions about kitchen extensions in Stamford
Is underfloor heating worth it?
In a large open-plan space it frees wall space for units and glazing and gives even heat. It is easiest to fit during the build.
Can I buy my own kitchen?
Yes. You can supply it and we fit it, or we supply it as part of the price. Either way we coordinate deliveries with the build programme.
How long will I be without a kitchen?
Usually 3 to 6 weeks at the end of the job, once the back wall is opened and the new kitchen goes in. We can help set up a temporary kitchen.
Who approves a kitchen extension in Stamford?
Planning matters in Stamford go to the council covering your address, and the work needs building control approval. We prepare and submit the applications for you.
How much does a kitchen extension cost in Stamford?
In Stamford, a kitchen extension typically costs £2,150–£3,250 per m² including a mid-range kitchen, including VAT at 20% (standard rate). A typical 22 m² project comes to roughly £47,500–£71,500. Your fixed price depends on the survey and drawings.
