SK Developments Free home visit0800 088 6248 Get a quote

Mid GlamorganMansard loft conversions

Mansard loft conversions in Maesteg

We take on mansard loft conversions in Maesteg, about 8 miles north-west of Bridgend, handling the drawings, approvals and construction so you deal with one company throughout.

Guide price in Maesteg

£60,000–£87,500 for a typical rear mansard

In Maesteg, a mansard loft conversion typically costs £60,000–£87,500 for a typical rear mansard, including VAT at 20% (standard rate).

Book a free home visit

Tell us about your project. We reply to arrange a visit and a fixed quote.

Free home visit and measured survey
Fixed price for the agreed specification
Drawings, approvals and build in one contract
Building control sign-off arranged
England, Wales, Scotland and Northern Ireland

What is a mansard loft conversion?

Mansard loft conversion with slate front slope and lead-clad dormers on a London terrace

A mansard loft conversion rebuilds the roof with a nearly vertical slope (about 72 degrees) and a flat top, effectively adding a new storey. Small dormer windows sit within the steep slope. Mansards are common on period terraces in towns and cities.

How much does a mansard loft conversion cost in Maesteg?

In Maesteg, a mansard loft conversion typically costs £60,000–£87,500 for a typical rear mansard, including VAT at 20% (standard rate). The guide for Maesteg reflects typical costs in Wales, roughly 8% below the UK-wide figure. Design, structural calculations and council fees are extra.

Guide prices for Maesteg, including VAT at 20% (standard rate)
Size or typeGuide range
A typical rear mansard£60,000–£87,500
Higher specification£87,500–£109,500

What moves the price most:

  • Roof covering: natural slate costs more
  • Party wall surveyor fees
  • Bathrooms and finishes
  • Scaffolding on busy streets

Your exact price depends on the survey and drawings. The guide price tool gives a quick range in the meantime.

Do you need planning permission for a mansard loft conversion in Maesteg?

Whether you need planning permission depends on your house and its location in Wales. In Wales a mansard roof needs planning permission and is judged against local design guidance.

The Party Wall etc. Act 1996 applies in Wales, so notices must be served before work on a shared wall, on the boundary, or excavation close to a neighbour’s foundations.

Our first visit includes a check of your planning history, so you know the route before paying for drawings.

What we handle

What we take care of:

  • New roof structure, slate or tile covering and lead work
  • Staircase and fire-safe escape route
  • Building control sign-off
  • Planning drawings and application
  • Insulation, electrics, plumbing and plastering
  • Dormer windows

How long does it take?

Build time is typically 9 to 12 weeks on site, after planning approval. Design and approvals come first and typically take 3 to 4 months, depending on the approval route.

Building in Maesteg

Terraced houses in Welsh towns often have narrow plots, which suits rear and side return extensions and rear dormers.

Projects in Maesteg (CF34) are surveyed in person before we quote, so the price reflects your actual property.

How it works

  1. 01

    Visit and measured survey

    A free visit to understand the project, check access and take measurements.

  2. 02

    Design and fixed quote

    Drawings, structural calculations and an itemised, fixed price for the agreed specification.

  3. 03

    Approvals

    Planning or permitted development confirmation, building regulations and any party wall matters.

  4. 04

    Construction and completion

    We build, put right any snags and hand over the building control certificate.

Questions about mansard loft conversions in Maesteg

Do I need planning permission for a mansard loft conversion in Maesteg?

In Wales a mansard roof needs planning permission and is judged against local design guidance.

What roof covering is used?

Natural slate is traditional; some councils accept other materials. We follow local guidance.

How long does a mansard loft conversion take in Maesteg?

Typically 9 to 12 weeks on site, after planning approval. Design and approvals beforehand usually take 3 to 4 months.

Can I stay at home?

Usually. The new roof is built under a temporary cover so the house stays dry.

Do I need party wall agreements?

Yes, mansards on terraced houses almost always involve both party walls.

How much does a mansard loft conversion cost in Maesteg?

In Maesteg, a mansard loft conversion typically costs £60,000–£87,500 for a typical rear mansard, including VAT at 20% (standard rate). Your fixed price depends on the survey and drawings.

Tell us about your project in Maesteg and we will arrange a free home visit.

Call 0800 088 6248 or get an instant guide price online.

Call 0800 088 6248Get a guide price