SK Developments Free home visit0800 088 6248 Get a quote

Greater LondonNew build homes

New build homes in Acton

A new build home in Acton starts with the site: access, services, ground conditions and planning. We work through each before giving a fixed price.

Guide price in Acton

£2,600–£4,150 per m² of floor area (build cost)

In Acton, a new build home typically costs £2,600–£4,150 per m² of floor area (build cost), including VAT at 0% (zero-rated for qualifying new dwellings). For a typical 150 m² project that is roughly £390,000–£622,500.

Book a free home visit

Tell us about your project. We reply to arrange a visit and a fixed quote.

Free home visit and measured survey
Fixed price for the agreed specification
Drawings, approvals and build in one contract
Building control sign-off arranged
England, Wales, Scotland and Northern Ireland

What is a new build home?

Newly completed contemporary detached house in brick, render and timber cladding

A new build home is a house built from the ground up on a cleared plot, a garden plot or a replacement-dwelling site. We work with plot owners and self-builders to design, gain approvals and build the house, either to a fixed design or from initial ideas.

How much does a new build home cost in Acton?

In Acton, a new build home typically costs £2,600–£4,150 per m² of floor area (build cost), including VAT at 0% (zero-rated for qualifying new dwellings). For a typical 150 m² project that is roughly £390,000–£622,500. We start from a UK-wide guide and adjust it for London, where labour and materials are typically about 30% above average. Design, structural calculations and council fees are extra.

Guide prices for Acton, including VAT at 0% (zero-rated for qualifying new dwellings)
Size or typeGuide range
Smaller project (105 m²)£273,000–£436,000
Typical project (150 m²)£390,000–£622,500
Larger project (210 m²)£546,000–£871,500
Rate per m²£2,600–£4,150

What moves the price most:

  • Site access and demolition
  • External works and landscaping
  • Size and complexity of the house
  • Specification and energy systems

Use the guide price tool to see how size and specification change the figure, then ask for a written, itemised quote.

Do you need planning permission for a new build home in Acton?

The approval route for Acton is set by planning law in England. In England a new home needs full planning permission (or permission in principle followed by technical details consent). Councils assess design, access, neighbours and drainage, and the Community Infrastructure Levy may apply, though self-builders can claim an exemption before starting.

Building regulations approval comes from the council’s building control service or a registered building control approver. The work is inspected at key stages, such as foundations, drainage and insulation, and a completion certificate is issued at the end.

If the answer is not clear-cut, we can apply for formal confirmation before you commit to the build.

What we handle

What we take care of:

  • Internal fit-out and finishes
  • Site appraisal and feasibility
  • Building control completion and warranty liaison
  • Superstructure, roof and windows
  • Mechanical and electrical installation
  • Structural and services design

How long does it take?

Build time is typically 9 to 14 months on site for a typical house. Before that, surveys, drawings and approvals usually take 4 to 9 months, longer if the council asks for changes.

Building in Acton

Space is at a premium in London, so homeowners often build out into the side return or up into the roof rather than move.

We work across Acton and neighbouring areas such as Chiswick, Hammersmith and Willesden. Postcodes we cover in Acton include W3.

How it works

  1. 01

    Free visit

    We look at the property, talk through what you want and measure up. There is no charge and no obligation.

  2. 02

    Drawings and written quote

    We prepare the design and give you a written, itemised quote with inclusions and exclusions.

  3. 03

    Permissions sorted

    Applications, building control and neighbour arrangements, all before the start date.

  4. 04

    Build and sign-off

    We run the build to a written programme and hand over the completion certificate.

Questions about new build homes in Acton

Is Community Infrastructure Levy payable?

In areas with CIL, new homes may be liable. Self-builders can apply for an exemption before work starts.

How long does a new build take?

A typical house takes 9 to 14 months on site after approvals.

How much does a new build home cost in Acton?

In Acton, a new build home typically costs £2,600–£4,150 per m² of floor area (build cost), including VAT at 0% (zero-rated for qualifying new dwellings). A typical 150 m² project comes to roughly £390,000–£622,500. Your fixed price depends on the survey and drawings.

Do I need planning permission?

Yes. A new dwelling always needs full planning permission (or permission in principle followed by technical details consent in England).

Do you build new build homes in Acton?

Yes. We build new build homes across Acton, including postcodes W3. Every project starts with a free home visit.

Ready to talk about a new build home in Acton? Book a free home visit or get an instant guide price.

Call 0800 088 6248 or get an instant guide price online.

Call 0800 088 6248Get a guide price