New build homes in Basingstoke

SK Developments builds new build homes in Basingstoke and across Hampshire, working with plot owners and developers from feasibility to completion.

Guide price in Basingstoke

£2,250–£3,600 per m² of floor area (build cost)

In Basingstoke, a new build home typically costs £2,250–£3,600 per m² of floor area (build cost), including VAT at 0% (zero-rated for qualifying new dwellings). For a typical 150 m² project that is roughly £337,500–£540,000.

Book a free home visit

Tell us about your project. We reply to arrange a visit and a fixed quote.

Free home visit and measured survey
Fixed price for the agreed specification
Drawings, approvals and build in one contract
Building control sign-off arranged
England, Wales, Scotland and Northern Ireland

What is a new build home?

Newly completed contemporary detached house in brick, render and timber cladding

A new build home is a house built from the ground up on a cleared plot, a garden plot or a replacement-dwelling site. We work with plot owners and self-builders to design, gain approvals and build the house, either to a fixed design or from initial ideas.

How much does a new build home cost in Basingstoke?

In Basingstoke, a new build home typically costs £2,250–£3,600 per m² of floor area (build cost), including VAT at 0% (zero-rated for qualifying new dwellings). For a typical 150 m² project that is roughly £337,500–£540,000. The guide for Basingstoke reflects typical costs in the South East, roughly 12% above the UK-wide figure. Design, structural calculations and council fees are extra.

Guide prices for Basingstoke, including VAT at 0% (zero-rated for qualifying new dwellings)
Size or typeGuide range
Smaller project (105 m²)£236,000–£378,000
Typical project (150 m²)£337,500–£540,000
Larger project (210 m²)£472,500–£756,000
Rate per m²£2,250–£3,600

Your quote will depend mainly on:

  • Services connections
  • External works and landscaping
  • Site access and demolition
  • Size and complexity of the house

Your exact price depends on the survey and drawings. The guide price tool gives a quick range in the meantime.

Do you need planning permission for a new build home in Basingstoke?

The approval route for Basingstoke is set by planning law in England. In England a new home needs full planning permission (or permission in principle followed by technical details consent). Councils assess design, access, neighbours and drainage, and the Community Infrastructure Levy may apply, though self-builders can claim an exemption before starting.

Building regulations approval comes from the council’s building control service or a registered building control approver. The work is inspected at key stages, such as foundations, drainage and insulation, and a completion certificate is issued at the end.

If the answer is not clear-cut, we can apply for formal confirmation before you commit to the build.

What we handle

The work we manage on a new build home:

  • Site appraisal and feasibility
  • Superstructure, roof and windows
  • Internal fit-out and finishes
  • Design and planning application
  • Mechanical and electrical installation
  • Structural and services design

How long does it take?

Build time is typically 9 to 14 months on site for a typical house. Allow time beforehand for drawings and approvals, usually 4 to 9 months.

Building in Basingstoke

Commuter towns across the South East have many 1930s and post-war semis that suit rear extensions and hip-to-gable loft conversions.

Basingstoke sits in Hampshire, about 14 miles south of Reading. We cover the whole of Basingstoke, including postcodes RG21.

How it works

  1. 01

    Visit and measured survey

    A free visit to understand the project, check access and take measurements.

  2. 02

    Design and fixed quote

    Drawings, structural calculations and an itemised, fixed price for the agreed specification.

  3. 03

    Approvals in place

    We handle planning, building control and neighbour notices before work starts.

  4. 04

    Build and sign-off

    We run the build to a written programme and hand over the completion certificate.

Questions about new build homes in Basingstoke

How long does a new build take?

A typical house takes 9 to 14 months on site after approvals.

Is Community Infrastructure Levy payable?

In areas with CIL, new homes may be liable. Self-builders can apply for an exemption before work starts.

How much does a new build home cost in Basingstoke?

In Basingstoke, a new build home typically costs £2,250–£3,600 per m² of floor area (build cost), including VAT at 0% (zero-rated for qualifying new dwellings). A typical 150 m² project comes to roughly £337,500–£540,000. Your fixed price depends on the survey and drawings.

What warranty will a new home need?

Lenders usually require a structural warranty or a professional consultant’s certificate. The warranty is arranged before work starts, and the provider inspects the build at key stages.

Who approves a new build home in Basingstoke?

Planning matters in Basingstoke go to the council covering your address, and the work needs building control approval. We prepare and submit the applications for you.

Get a free, no-obligation home visit for your new build home in Basingstoke.

Call 0800 088 6248 or get an instant guide price online.