SK Developments Free home visit0800 088 6248 Get a quote

SomersetNew build homes

New build homes in Bath

A new build home in Bath starts with the site: access, services, ground conditions and planning. We work through each before giving a fixed price.

Guide price in Bath

£2,050–£3,250 per m² of floor area (build cost)

In Bath, a new build home typically costs £2,050–£3,250 per m² of floor area (build cost), including VAT at 0% (zero-rated for qualifying new dwellings). For a typical 150 m² project that is roughly £307,500–£487,500.

Book a free home visit

Tell us about your project. We reply to arrange a visit and a fixed quote.

Free home visit and measured survey
Fixed price for the agreed specification
Drawings, approvals and build in one contract
Building control sign-off arranged
England, Wales, Scotland and Northern Ireland

What is a new build home?

Newly completed contemporary detached house in brick, render and timber cladding

A new build home is a house built from the ground up on a cleared plot, a garden plot or a replacement-dwelling site. We work with plot owners and self-builders to design, gain approvals and build the house, either to a fixed design or from initial ideas.

How much does a new build home cost in Bath?

In Bath, a new build home typically costs £2,050–£3,250 per m² of floor area (build cost), including VAT at 0% (zero-rated for qualifying new dwellings). For a typical 150 m² project that is roughly £307,500–£487,500. Prices in the South West sit near the national average for this kind of work, and the range for Bath reflects that. Design, structural calculations and council fees are extra.

Guide prices for Bath, including VAT at 0% (zero-rated for qualifying new dwellings)
Size or typeGuide range
Smaller project (105 m²)£215,000–£341,000
Typical project (150 m²)£307,500–£487,500
Larger project (210 m²)£430,500–£682,500
Rate per m²£2,050–£3,250

The biggest cost drivers are:

  • Services connections
  • External works and landscaping
  • Size and complexity of the house
  • Site access and demolition

Your exact price depends on the survey and drawings. The guide price tool gives a quick range in the meantime.

Do you need planning permission for a new build home in Bath?

Whether you need planning permission depends on your house and its location in England. In England a new home needs full planning permission (or permission in principle followed by technical details consent). Councils assess design, access, neighbours and drainage, and the Community Infrastructure Levy may apply, though self-builders can claim an exemption before starting.

Building regulations approval comes from the council’s building control service or a registered building control approver. The work is inspected at key stages, such as foundations, drainage and insulation, and a completion certificate is issued at the end.

We check this for your address before design work starts, so there are no surprises later.

What we handle

What we take care of:

  • Internal fit-out and finishes
  • Site appraisal and feasibility
  • Mechanical and electrical installation
  • Design and planning application
  • Structural and services design
  • Superstructure, roof and windows

How long does it take?

Build time is typically 9 to 14 months on site for a typical house. Before that, surveys, drawings and approvals usually take 4 to 9 months, longer if the council asks for changes.

Building in Bath

The South West mixes stone and render cottages with post-war and newer estates, and local materials matter more here when matching an extension.

Projects in Bath (BA1) are surveyed in person before we quote, so the price reflects your actual property.

How it works

  1. 01

    Visit and measured survey

    A free visit to understand the project, check access and take measurements.

  2. 02

    Design and pricing

    Design options, then a fixed quote based on the chosen drawings and specification.

  3. 03

    Approvals

    Planning or permitted development confirmation, building regulations and any party wall matters.

  4. 04

    Construction and completion

    We build, put right any snags and hand over the building control certificate.

Questions about new build homes in Bath

Is VAT charged on building a new house?

Construction services for a new dwelling are normally zero-rated when supplied by a VAT-registered builder. Self-builders who buy materials directly can reclaim VAT through HMRC’s DIY housebuilders scheme.

Can you build to my architect’s design?

Yes. We price and build from your drawings, or we can manage the design for you.

How long does a new build home take in Bath?

Typically 9 to 14 months on site for a typical house. Design and approvals beforehand usually take 4 to 9 months.

Is Community Infrastructure Levy payable?

In areas with CIL, new homes may be liable. Self-builders can apply for an exemption before work starts.

How much does a new build home cost in Bath?

In Bath, a new build home typically costs £2,050–£3,250 per m² of floor area (build cost), including VAT at 0% (zero-rated for qualifying new dwellings). A typical 150 m² project comes to roughly £307,500–£487,500. Your fixed price depends on the survey and drawings.

Get a free, no-obligation home visit for your new build home in Bath.

Call 0800 088 6248 or get an instant guide price online.

Call 0800 088 6248Get a guide price