Greater LondonNew build homes

New build homes in Battersea

We take on new build homes in Battersea, about 3 miles south-west of central London, starting with a free look at the site and a clear view of the approvals needed.

Guide price in Battersea

£2,600–£4,150 per m² of floor area (build cost)

In Battersea, a new build home typically costs £2,600–£4,150 per m² of floor area (build cost), including VAT at 0% (zero-rated for qualifying new dwellings). For a typical 150 m² project that is roughly £390,000–£622,500.

Book a free home visit

Tell us about your project. We reply to arrange a visit and a fixed quote.

Free home visit and measured survey
Fixed price for the agreed specification
Drawings, approvals and build in one contract
Building control sign-off arranged
England, Wales, Scotland and Northern Ireland

What is a new build home?

Newly completed contemporary detached house in brick, render and timber cladding

A new build home is a house built from the ground up on a cleared plot, a garden plot or a replacement-dwelling site. We work with plot owners and self-builders to design, gain approvals and build the house, either to a fixed design or from initial ideas.

How much does a new build home cost in Battersea?

In Battersea, a new build home typically costs £2,600–£4,150 per m² of floor area (build cost), including VAT at 0% (zero-rated for qualifying new dwellings). For a typical 150 m² project that is roughly £390,000–£622,500. We start from a UK-wide guide and adjust it for London, where labour and materials are typically about 30% above average. Design, structural calculations and council fees are extra.

Guide prices for Battersea, including VAT at 0% (zero-rated for qualifying new dwellings)
Size or typeGuide range
Smaller project (105 m²)£273,000–£436,000
Typical project (150 m²)£390,000–£622,500
Larger project (210 m²)£546,000–£871,500
Rate per m²£2,600–£4,150

Your quote will depend mainly on:

  • External works and landscaping
  • Specification and energy systems
  • Ground conditions and foundations
  • Size and complexity of the house

Use the guide price tool to see how size and specification change the figure, then ask for a written, itemised quote.

Do you need planning permission for a new build home in Battersea?

Whether you need planning permission depends on your house and its location in England. In England a new home needs full planning permission (or permission in principle followed by technical details consent). Councils assess design, access, neighbours and drainage, and the Community Infrastructure Levy may apply, though self-builders can claim an exemption before starting.

Building regulations approval comes from the council’s building control service or a registered building control approver. The work is inspected at key stages, such as foundations, drainage and insulation, and a completion certificate is issued at the end.

If the answer is not clear-cut, we can apply for formal confirmation before you commit to the build.

What we handle

On a typical new build home we handle:

  • Internal fit-out and finishes
  • Groundworks, foundations and drainage
  • Superstructure, roof and windows
  • Structural and services design
  • Design and planning application
  • Building control completion and warranty liaison

How long does it take?

Build time is typically 9 to 14 months on site for a typical house. Design and approvals come first and typically take 4 to 9 months, depending on the approval route.

Building in Battersea

Many London boroughs have conservation areas and detailed design guides, so early design advice saves time at the planning stage.

If your home is in Battersea or close by in Wandsworth, Chelsea and Clapham, a free home visit is the first step.

How it works

  1. 01

    Survey and brief

    We visit, discuss your ideas and budget, and survey the property or site at no cost.

  2. 02

    Design and fixed quote

    Drawings, structural calculations and an itemised, fixed price for the agreed specification.

  3. 03

    Approvals in place

    We handle planning, building control and neighbour notices before work starts.

  4. 04

    Construction and completion

    We build, put right any snags and hand over the building control certificate.

Questions about new build homes in Battersea

Is Community Infrastructure Levy payable?

In areas with CIL, new homes may be liable. Self-builders can apply for an exemption before work starts.

Do I need planning permission?

Yes. A new dwelling always needs full planning permission (or permission in principle followed by technical details consent in England).

Do you build new build homes in Battersea?

Yes. We build new build homes across Battersea, including postcodes SW11. Every project starts with a free home visit.

How much does a new build home cost in Battersea?

In Battersea, a new build home typically costs £2,600–£4,150 per m² of floor area (build cost), including VAT at 0% (zero-rated for qualifying new dwellings). A typical 150 m² project comes to roughly £390,000–£622,500. Your fixed price depends on the survey and drawings.

How long does a new build take?

A typical house takes 9 to 14 months on site after approvals.

Tell us about your project in Battersea and we will arrange a free home visit.

Call 0800 088 6248 or get an instant guide price online.