New build homes in Buckinghamshire

Our new build home service covers Buckinghamshire, including Milton Keynes, High Wycombe and Aylesbury. You deal with one company from the first visit to the completion certificate.

Guide price in Buckinghamshire

£2,250–£3,600 per m² of floor area (build cost)

In Buckinghamshire, a new build home typically costs £2,250–£3,600 per m² of floor area (build cost), including VAT at 0% (zero-rated for qualifying new dwellings). For a typical 150 m² project that is roughly £337,500–£540,000.

Book a free home visit

Tell us about your project. We reply to arrange a visit and a fixed quote.

Free home visit and measured survey
Fixed price for the agreed specification
Drawings, approvals and build in one contract
Building control sign-off arranged
England, Wales, Scotland and Northern Ireland

What is a new build home?

Newly completed contemporary detached house in brick, render and timber cladding

A new build home is a house built from the ground up on a cleared plot, a garden plot or a replacement-dwelling site. We work with plot owners and self-builders to design, gain approvals and build the house, either to a fixed design or from initial ideas.

How much does a new build home cost in Buckinghamshire?

In Buckinghamshire, a new build home typically costs £2,250–£3,600 per m² of floor area (build cost), including VAT at 0% (zero-rated for qualifying new dwellings). For a typical 150 m² project that is roughly £337,500–£540,000. We start from a UK-wide guide and adjust it for the South East, where labour and materials are typically about 12% above average. Design, structural calculations and council fees are extra.

Guide prices for Buckinghamshire, including VAT at 0% (zero-rated for qualifying new dwellings)
Size or typeGuide range
Smaller project (105 m²)£236,000–£378,000
Typical project (150 m²)£337,500–£540,000
Larger project (210 m²)£472,500–£756,000
Rate per m²£2,250–£3,600

What moves the price most:

  • External works and landscaping
  • Specification and energy systems
  • Services connections
  • Size and complexity of the house

A guide range is only a starting point: the guide price tool gives an instant figure for your size, and a free survey turns it into a fixed quote.

Do you need planning permission for a new build home in Buckinghamshire?

Whether you need planning permission depends on your house and its location in England. In England a new home needs full planning permission (or permission in principle followed by technical details consent). Councils assess design, access, neighbours and drainage, and the Community Infrastructure Levy may apply, though self-builders can claim an exemption before starting.

Building regulations approval comes from the council’s building control service or a registered building control approver. The work is inspected at key stages, such as foundations, drainage and insulation, and a completion certificate is issued at the end.

If the answer is not clear-cut, we can apply for formal confirmation before you commit to the build.

What we handle

The work we manage on a new build home:

  • Groundworks, foundations and drainage
  • Internal fit-out and finishes
  • Building control completion and warranty liaison
  • Mechanical and electrical installation
  • Site appraisal and feasibility
  • Superstructure, roof and windows

How long does it take?

The build itself usually takes 9 to 14 months on site for a typical house. Before that, surveys, drawings and approvals usually take 4 to 9 months, longer if the council asks for changes.

Building in Buckinghamshire

The South East has a broad mix of housing, from Victorian terraces in the towns to post-war semis and newer estates, so extension types vary street by street.

Towns we cover in Buckinghamshire include Milton Keynes, High Wycombe, Aylesbury, Bletchley, Amersham and Chesham.

How it works

  1. 01

    Free visit

    We look at the property, talk through what you want and measure up. There is no charge and no obligation.

  2. 02

    Design and pricing

    Design options, then a fixed quote based on the chosen drawings and specification.

  3. 03

    Approvals in place

    We handle planning, building control and neighbour notices before work starts.

  4. 04

    Build and handover

    Work follows the agreed programme, with inspections along the way and a completion certificate at the end.

Questions about new build homes in Buckinghamshire

Is Community Infrastructure Levy payable?

In areas with CIL, new homes may be liable. Self-builders can apply for an exemption before work starts.

Do you build new build homes in Buckinghamshire?

Yes. We build new build homes across Buckinghamshire, including postcodes HP10, HP11, HP12, HP13 and HP14. Every project starts with a free home visit.

What warranty will a new home need?

Lenders usually require a structural warranty or a professional consultant’s certificate. The warranty is arranged before work starts, and the provider inspects the build at key stages.

How long does a new build take?

A typical house takes 9 to 14 months on site after approvals.

How much does a new build home cost in Buckinghamshire?

In Buckinghamshire, a new build home typically costs £2,250–£3,600 per m² of floor area (build cost), including VAT at 0% (zero-rated for qualifying new dwellings). A typical 150 m² project comes to roughly £337,500–£540,000. Your fixed price depends on the survey and drawings.

Start with a guide price, then book a free survey for a fixed quote in Buckinghamshire.

Call 0800 088 6248 or get an instant guide price online.

Call 0800 088 6248Get a guide price