New build homes in Daventry

Planning a new build home in Daventry? We look at the site, coordinate the design and approvals, and build it under one contract.

Guide price in Daventry

£1,900–£3,050 per m² of floor area (build cost)

In Daventry, a new build home typically costs £1,900–£3,050 per m² of floor area (build cost), including VAT at 0% (zero-rated for qualifying new dwellings). For a typical 150 m² project that is roughly £285,000–£457,500.

Book a free home visit

Tell us about your project. We reply to arrange a visit and a fixed quote.

Free home visit and measured survey
Fixed price for the agreed specification
Drawings, approvals and build in one contract
Building control sign-off arranged
England, Wales, Scotland and Northern Ireland

What is a new build home?

Newly completed contemporary detached house in brick, render and timber cladding

A new build home is a house built from the ground up on a cleared plot, a garden plot or a replacement-dwelling site. We work with plot owners and self-builders to design, gain approvals and build the house, either to a fixed design or from initial ideas.

How much does a new build home cost in Daventry?

In Daventry, a new build home typically costs £1,900–£3,050 per m² of floor area (build cost), including VAT at 0% (zero-rated for qualifying new dwellings). For a typical 150 m² project that is roughly £285,000–£457,500. We start from a UK-wide guide and adjust it for the East Midlands, where labour and materials are typically about 5% below average. Design, structural calculations and council fees are extra.

Guide prices for Daventry, including VAT at 0% (zero-rated for qualifying new dwellings)
Size or typeGuide range
Smaller project (105 m²)£199,500–£320,000
Typical project (150 m²)£285,000–£457,500
Larger project (210 m²)£399,000–£640,500
Rate per m²£1,900–£3,050

The biggest cost drivers are:

  • Services connections
  • Ground conditions and foundations
  • Specification and energy systems
  • Size and complexity of the house

Use the guide price tool to see how size and specification change the figure, then ask for a written, itemised quote.

Do you need planning permission for a new build home in Daventry?

Before anything is built in Daventry, we confirm which approvals apply in England. In England a new home needs full planning permission (or permission in principle followed by technical details consent). Councils assess design, access, neighbours and drainage, and the Community Infrastructure Levy may apply, though self-builders can claim an exemption before starting.

Building regulations approval comes from the council’s building control service or a registered building control approver. The work is inspected at key stages, such as foundations, drainage and insulation, and a completion certificate is issued at the end.

At the survey we check your house’s planning history and any restrictions, and tell you which route applies.

What we handle

The work we manage on a new build home:

  • Superstructure, roof and windows
  • Internal fit-out and finishes
  • Design and planning application
  • Site appraisal and feasibility
  • Building control completion and warranty liaison
  • Mechanical and electrical installation

How long does it take?

Allow 9 to 14 months on site for a typical house. Before that, surveys, drawings and approvals usually take 4 to 9 months, longer if the council asks for changes.

Building in Daventry

In the East Midlands, many estates built since the 1960s have integral garages that convert well into a study or bedroom.

If your home is in Daventry or close by in Rugby, Northampton and Leamington Spa, a free home visit is the first step.

How it works

  1. 01

    Free visit

    We look at the property, talk through what you want and measure up. There is no charge and no obligation.

  2. 02

    Design and fixed quote

    Drawings, structural calculations and an itemised, fixed price for the agreed specification.

  3. 03

    Permissions sorted

    Applications, building control and neighbour arrangements, all before the start date.

  4. 04

    Construction and completion

    We build, put right any snags and hand over the building control certificate.

Questions about new build homes in Daventry

How long does a new build home take in Daventry?

Typically 9 to 14 months on site for a typical house. Design and approvals beforehand usually take 4 to 9 months.

Do I need planning permission?

Yes. A new dwelling always needs full planning permission (or permission in principle followed by technical details consent in England).

Is Community Infrastructure Levy payable?

In areas with CIL, new homes may be liable. Self-builders can apply for an exemption before work starts.

How much does a new build home cost in Daventry?

In Daventry, a new build home typically costs £1,900–£3,050 per m² of floor area (build cost), including VAT at 0% (zero-rated for qualifying new dwellings). A typical 150 m² project comes to roughly £285,000–£457,500. Your fixed price depends on the survey and drawings.

Can you build to my architect’s design?

Yes. We price and build from your drawings, or we can manage the design for you.

Get a free, no-obligation home visit for your new build home in Daventry.

Call 0800 088 6248 or get an instant guide price online.

Call 0800 088 6248Get a guide price