What is a new build home?

A new build home is a house built from the ground up on a cleared plot, a garden plot or a replacement-dwelling site. We work with plot owners and self-builders to design, gain approvals and build the house, either to a fixed design or from initial ideas.
How much does a new build home cost in Durham?
In Durham, a new build home typically costs £1,800–£2,900 per m² of floor area (build cost), including VAT at 0% (zero-rated for qualifying new dwellings). For a typical 150 m² project that is roughly £270,000–£435,000. The guide for Durham reflects typical costs in the North East, roughly 10% below the UK-wide figure. Design, structural calculations and council fees are extra.
| Size or type | Guide range |
|---|---|
| Smaller project (105 m²) | £189,000–£304,500 |
| Typical project (150 m²) | £270,000–£435,000 |
| Larger project (210 m²) | £378,000–£609,000 |
| Rate per m² | £1,800–£2,900 |
What moves the price most:
- External works and landscaping
- Size and complexity of the house
- Specification and energy systems
- Ground conditions and foundations
Use the guide price tool to see how size and specification change the figure, then ask for a written, itemised quote.
Do you need planning permission for a new build home in Durham?
Here is how the rules work for a new build home in England. In England a new home needs full planning permission (or permission in principle followed by technical details consent). Councils assess design, access, neighbours and drainage, and the Community Infrastructure Levy may apply, though self-builders can claim an exemption before starting.
Building regulations approval comes from the council’s building control service or a registered building control approver. The work is inspected at key stages, such as foundations, drainage and insulation, and a completion certificate is issued at the end.
We check this for your address before design work starts, so there are no surprises later.
What we handle
From survey to sign-off, the job normally involves:
- Structural and services design
- Site appraisal and feasibility
- Design and planning application
- Internal fit-out and finishes
- Superstructure, roof and windows
- Groundworks, foundations and drainage
How long does it take?
The build itself usually takes 9 to 14 months on site for a typical house. Design and approvals come first and typically take 4 to 9 months, depending on the approval route.
Building in Durham
Across the North East, colliery-era terraces and newer estates sit side by side, so the right project depends on the house type.
Durham sits in County Durham. We cover the whole of Durham, including postcodes DH1.
How it works
- 01
Free visit
We look at the property, talk through what you want and measure up. There is no charge and no obligation.
- 02
Design and pricing
Design options, then a fixed quote based on the chosen drawings and specification.
- 03
Approvals in place
We handle planning, building control and neighbour notices before work starts.
- 04
Construction and completion
We build, put right any snags and hand over the building control certificate.
Questions about new build homes in Durham
How much does a new build home cost in Durham?
In Durham, a new build home typically costs £1,800–£2,900 per m² of floor area (build cost), including VAT at 0% (zero-rated for qualifying new dwellings). A typical 150 m² project comes to roughly £270,000–£435,000. Your fixed price depends on the survey and drawings.
What warranty will a new home need?
Lenders usually require a structural warranty or a professional consultant’s certificate. The warranty is arranged before work starts, and the provider inspects the build at key stages.
Is Community Infrastructure Levy payable?
In areas with CIL, new homes may be liable. Self-builders can apply for an exemption before work starts.
Can you build to my architect’s design?
Yes. We price and build from your drawings, or we can manage the design for you.
How long does a new build home take in Durham?
Typically 9 to 14 months on site for a typical house. Design and approvals beforehand usually take 4 to 9 months.