What is a new build home?

A new build home is a house built from the ground up on a cleared plot, a garden plot or a replacement-dwelling site. We work with plot owners and self-builders to design, gain approvals and build the house, either to a fixed design or from initial ideas.
How much does a new build home cost in Glasgow?
In Glasgow, a new build home typically costs £1,950–£3,100 per m² of floor area (build cost), including VAT at 0% (zero-rated for qualifying new dwellings). For a typical 150 m² project that is roughly £292,500–£465,000. Building costs in Scotland are close to the UK average, so the figures for Glasgow are close to our national guide. Design, structural calculations and council fees are extra.
| Size or type | Guide range |
|---|---|
| Smaller project (105 m²) | £205,000–£325,500 |
| Typical project (150 m²) | £292,500–£465,000 |
| Larger project (210 m²) | £409,500–£651,000 |
| Rate per m² | £1,950–£3,100 |
The biggest cost drivers are:
- Services connections
- Specification and energy systems
- External works and landscaping
- Size and complexity of the house
A guide range is only a starting point: the guide price tool gives an instant figure for your size, and a free survey turns it into a fixed quote.
Do you need planning permission for a new build home in Glasgow?
The approval route for Glasgow is set by planning law in Scotland. In Scotland a new home needs planning permission and a building warrant before work starts.
In Scotland a building warrant is needed before work starts on most extensions, loft conversions and conversions. It is issued by the council’s building standards service. When the work is finished, a completion certificate is submitted and accepted by the council after inspection.
We check this for your address before design work starts, so there are no surprises later.
What we handle
The work we manage on a new build home:
- Design and planning application
- Groundworks, foundations and drainage
- Superstructure, roof and windows
- Structural and services design
- Mechanical and electrical installation
- Site appraisal and feasibility
How long does it take?
Build time is typically 9 to 14 months on site for a typical house. Allow time beforehand for drawings and approvals, usually 4 to 9 months.
Building in Glasgow
Scotland’s housing ranges from sandstone tenements and villas to post-war and modern estates, and the building warrant system shapes how projects are planned.
We cover the whole of Glasgow.
How it works
- 01
Visit and measured survey
A free visit to understand the project, check access and take measurements.
- 02
Drawings and written quote
We prepare the design and give you a written, itemised quote with inclusions and exclusions.
- 03
Approvals
Planning or permitted development confirmation, building regulations and any party wall matters.
- 04
Construction and completion
We build, put right any snags and hand over the building control certificate.
Questions about new build homes in Glasgow
Is VAT charged on building a new house?
Construction services for a new dwelling are normally zero-rated when supplied by a VAT-registered builder. Self-builders who buy materials directly can reclaim VAT through HMRC’s DIY housebuilders scheme.
Can you build to my architect’s design?
Yes. We price and build from your drawings, or we can manage the design for you.
Do I need planning permission for a new build home in Glasgow?
In Scotland a new home needs planning permission and a building warrant before work starts.
Is Community Infrastructure Levy payable?
In areas with CIL, new homes may be liable. Self-builders can apply for an exemption before work starts.
How much does a new build home cost in Glasgow?
In Glasgow, a new build home typically costs £1,950–£3,100 per m² of floor area (build cost), including VAT at 0% (zero-rated for qualifying new dwellings). A typical 150 m² project comes to roughly £292,500–£465,000. Your fixed price depends on the survey and drawings.
How long does a new build home take in Glasgow?
Typically 9 to 14 months on site for a typical house. Design and approvals beforehand usually take 4 to 9 months.