What is a new build home?

A new build home is a house built from the ground up on a cleared plot, a garden plot or a replacement-dwelling site. We work with plot owners and self-builders to design, gain approvals and build the house, either to a fixed design or from initial ideas.
How much does a new build home cost in Havant?
In Havant, a new build home typically costs £2,250–£3,600 per m² of floor area (build cost), including VAT at 0% (zero-rated for qualifying new dwellings). For a typical 150 m² project that is roughly £337,500–£540,000. We start from a UK-wide guide and adjust it for the South East, where labour and materials are typically about 12% above average. Design, structural calculations and council fees are extra.
| Size or type | Guide range |
|---|---|
| Smaller project (105 m²) | £236,000–£378,000 |
| Typical project (150 m²) | £337,500–£540,000 |
| Larger project (210 m²) | £472,500–£756,000 |
| Rate per m² | £2,250–£3,600 |
The biggest cost drivers are:
- Ground conditions and foundations
- Size and complexity of the house
- Specification and energy systems
- Site access and demolition
A guide range is only a starting point: the guide price tool gives an instant figure for your size, and a free survey turns it into a fixed quote.
Do you need planning permission for a new build home in Havant?
Before anything is built in Havant, we confirm which approvals apply in England. In England a new home needs full planning permission (or permission in principle followed by technical details consent). Councils assess design, access, neighbours and drainage, and the Community Infrastructure Levy may apply, though self-builders can claim an exemption before starting.
Building regulations approval comes from the council’s building control service or a registered building control approver. The work is inspected at key stages, such as foundations, drainage and insulation, and a completion certificate is issued at the end.
At the survey we check your house’s planning history and any restrictions, and tell you which route applies.
What we handle
What we take care of:
- Structural and services design
- Superstructure, roof and windows
- Design and planning application
- Site appraisal and feasibility
- Building control completion and warranty liaison
- Mechanical and electrical installation
How long does it take?
The build itself usually takes 9 to 14 months on site for a typical house. Design and approvals come first and typically take 4 to 9 months, depending on the approval route.
Building in Havant
The South East has a broad mix of housing, from Victorian terraces in the towns to post-war semis and newer estates, so extension types vary street by street.
We work across Havant and neighbouring areas such as Emsworth, Waterlooville and Portsmouth. Postcodes we cover in Havant include PO9.
How it works
- 01
Survey and brief
We visit, discuss your ideas and budget, and survey the property or site at no cost.
- 02
Drawings and written quote
We prepare the design and give you a written, itemised quote with inclusions and exclusions.
- 03
Permissions sorted
Applications, building control and neighbour arrangements, all before the start date.
- 04
Build and handover
Work follows the agreed programme, with inspections along the way and a completion certificate at the end.
Questions about new build homes in Havant
Is VAT charged on building a new house?
Construction services for a new dwelling are normally zero-rated when supplied by a VAT-registered builder. Self-builders who buy materials directly can reclaim VAT through HMRC’s DIY housebuilders scheme.
How much does a new build home cost in Havant?
In Havant, a new build home typically costs £2,250–£3,600 per m² of floor area (build cost), including VAT at 0% (zero-rated for qualifying new dwellings). A typical 150 m² project comes to roughly £337,500–£540,000. Your fixed price depends on the survey and drawings.
Do you build new build homes in Havant?
Yes. We build new build homes across Havant, including postcodes PO9. Every project starts with a free home visit.
Do I need planning permission?
Yes. A new dwelling always needs full planning permission (or permission in principle followed by technical details consent in England).
Can you build to my architect’s design?
Yes. We price and build from your drawings, or we can manage the design for you.