What is a new build home?

A new build home is a house built from the ground up on a cleared plot, a garden plot or a replacement-dwelling site. We work with plot owners and self-builders to design, gain approvals and build the house, either to a fixed design or from initial ideas.
How much does a new build home cost in Herefordshire?
In Herefordshire, a new build home typically costs £1,950–£3,100 per m² of floor area (build cost), including VAT at 0% (zero-rated for qualifying new dwellings). For a typical 150 m² project that is roughly £292,500–£465,000. Prices in the West Midlands sit near the national average for this kind of work, and the range for Herefordshire reflects that. Design, structural calculations and council fees are extra.
| Size or type | Guide range |
|---|---|
| Smaller project (105 m²) | £205,000–£325,500 |
| Typical project (150 m²) | £292,500–£465,000 |
| Larger project (210 m²) | £409,500–£651,000 |
| Rate per m² | £1,950–£3,100 |
Your quote will depend mainly on:
- Specification and energy systems
- Services connections
- Ground conditions and foundations
- Size and complexity of the house
For a figure based on your own measurements, try the guide price tool, then book a free home visit for a fixed quote.
Do you need planning permission for a new build home in Herefordshire?
The approval route for Herefordshire is set by planning law in England. In England a new home needs full planning permission (or permission in principle followed by technical details consent). Councils assess design, access, neighbours and drainage, and the Community Infrastructure Levy may apply, though self-builders can claim an exemption before starting.
Building regulations approval comes from the council’s building control service or a registered building control approver. The work is inspected at key stages, such as foundations, drainage and insulation, and a completion certificate is issued at the end.
We check this for your address before design work starts, so there are no surprises later.
What we handle
From survey to sign-off, the job normally involves:
- Groundworks, foundations and drainage
- Superstructure, roof and windows
- Structural and services design
- Design and planning application
- Building control completion and warranty liaison
- Mechanical and electrical installation
How long does it take?
Allow 9 to 14 months on site for a typical house. Allow time beforehand for drawings and approvals, usually 4 to 9 months.
Building in Herefordshire
The West Midlands has large numbers of 1930s semis and Victorian terraces, which suit rear extensions, side extensions and dormer loft conversions.
Towns we cover in Herefordshire include Hereford, Leominster and Ledbury.
How it works
- 01
Visit and measured survey
A free visit to understand the project, check access and take measurements.
- 02
Drawings and written quote
We prepare the design and give you a written, itemised quote with inclusions and exclusions.
- 03
Permissions sorted
Applications, building control and neighbour arrangements, all before the start date.
- 04
Build and handover
Work follows the agreed programme, with inspections along the way and a completion certificate at the end.
Questions about new build homes in Herefordshire
Is Community Infrastructure Levy payable?
In areas with CIL, new homes may be liable. Self-builders can apply for an exemption before work starts.
How much does a new build home cost in Herefordshire?
In Herefordshire, a new build home typically costs £1,950–£3,100 per m² of floor area (build cost), including VAT at 0% (zero-rated for qualifying new dwellings). A typical 150 m² project comes to roughly £292,500–£465,000. Your fixed price depends on the survey and drawings.
What warranty will a new home need?
Lenders usually require a structural warranty or a professional consultant’s certificate. The warranty is arranged before work starts, and the provider inspects the build at key stages.
How long does a new build home take in Herefordshire?
Typically 9 to 14 months on site for a typical house. Design and approvals beforehand usually take 4 to 9 months.
Do I need planning permission?
Yes. A new dwelling always needs full planning permission (or permission in principle followed by technical details consent in England).