SK Developments Free home visit0800 088 6248 Get a quote

Greater LondonNew build homes

New build homes in New Malden

Planning a new build home in New Malden? We look at the site, coordinate the design and approvals, and build it under one contract.

Guide price in New Malden

£2,600–£4,150 per m² of floor area (build cost)

In New Malden, a new build home typically costs £2,600–£4,150 per m² of floor area (build cost), including VAT at 0% (zero-rated for qualifying new dwellings). For a typical 150 m² project that is roughly £390,000–£622,500.

Book a free home visit

Tell us about your project. We reply to arrange a visit and a fixed quote.

Free home visit and measured survey
Fixed price for the agreed specification
Drawings, approvals and build in one contract
Building control sign-off arranged
England, Wales, Scotland and Northern Ireland

What is a new build home?

Newly completed contemporary detached house in brick, render and timber cladding

A new build home is a house built from the ground up on a cleared plot, a garden plot or a replacement-dwelling site. We work with plot owners and self-builders to design, gain approvals and build the house, either to a fixed design or from initial ideas.

How much does a new build home cost in New Malden?

In New Malden, a new build home typically costs £2,600–£4,150 per m² of floor area (build cost), including VAT at 0% (zero-rated for qualifying new dwellings). For a typical 150 m² project that is roughly £390,000–£622,500. Prices across London are typically 30% above the UK average for this kind of work, which is reflected in the range for New Malden. Design, structural calculations and council fees are extra.

Guide prices for New Malden, including VAT at 0% (zero-rated for qualifying new dwellings)
Size or typeGuide range
Smaller project (105 m²)£273,000–£436,000
Typical project (150 m²)£390,000–£622,500
Larger project (210 m²)£546,000–£871,500
Rate per m²£2,600–£4,150

The main things that change the cost:

  • Size and complexity of the house
  • External works and landscaping
  • Ground conditions and foundations
  • Site access and demolition

Use the guide price tool to see how size and specification change the figure, then ask for a written, itemised quote.

Do you need planning permission for a new build home in New Malden?

Whether you need planning permission depends on your house and its location in England. In England a new home needs full planning permission (or permission in principle followed by technical details consent). Councils assess design, access, neighbours and drainage, and the Community Infrastructure Levy may apply, though self-builders can claim an exemption before starting.

Building regulations approval comes from the council’s building control service or a registered building control approver. The work is inspected at key stages, such as foundations, drainage and insulation, and a completion certificate is issued at the end.

If the answer is not clear-cut, we can apply for formal confirmation before you commit to the build.

What we handle

From survey to sign-off, the job normally involves:

  • Building control completion and warranty liaison
  • Structural and services design
  • Internal fit-out and finishes
  • Groundworks, foundations and drainage
  • Superstructure, roof and windows
  • Design and planning application

How long does it take?

Build time is typically 9 to 14 months on site for a typical house. Allow time beforehand for drawings and approvals, usually 4 to 9 months.

Building in New Malden

Space is at a premium in London, so homeowners often build out into the side return or up into the roof rather than move.

From KT3 outwards, we take on projects throughout New Malden and the surrounding parts of Greater London.

How it works

  1. 01

    Survey and brief

    We visit, discuss your ideas and budget, and survey the property or site at no cost.

  2. 02

    Design and pricing

    Design options, then a fixed quote based on the chosen drawings and specification.

  3. 03

    Permissions sorted

    Applications, building control and neighbour arrangements, all before the start date.

  4. 04

    Build and handover

    Work follows the agreed programme, with inspections along the way and a completion certificate at the end.

Questions about new build homes in New Malden

Is Community Infrastructure Levy payable?

In areas with CIL, new homes may be liable. Self-builders can apply for an exemption before work starts.

Who approves a new build home in New Malden?

Planning matters in New Malden go to the council covering your address, and the work needs building control approval. We prepare and submit the applications for you.

How much does a new build home cost in New Malden?

In New Malden, a new build home typically costs £2,600–£4,150 per m² of floor area (build cost), including VAT at 0% (zero-rated for qualifying new dwellings). A typical 150 m² project comes to roughly £390,000–£622,500. Your fixed price depends on the survey and drawings.

Can you build to my architect’s design?

Yes. We price and build from your drawings, or we can manage the design for you.

How long does a new build take?

A typical house takes 9 to 14 months on site after approvals.

Tell us about your project in New Malden and we will arrange a free home visit.

Call 0800 088 6248 or get an instant guide price online.

Call 0800 088 6248Get a guide price