What is a new build home?

A new build home is a house built from the ground up on a cleared plot, a garden plot or a replacement-dwelling site. We work with plot owners and self-builders to design, gain approvals and build the house, either to a fixed design or from initial ideas.
How much does a new build home cost in Nottingham?
In Nottingham, a new build home typically costs £1,900–£3,050 per m² of floor area (build cost), including VAT at 0% (zero-rated for qualifying new dwellings). For a typical 150 m² project that is roughly £285,000–£457,500. Building costs in the East Midlands run about 5% below the UK average, and the figures for Nottingham are adjusted to reflect that. Design, structural calculations and council fees are extra.
| Size or type | Guide range |
|---|---|
| Smaller project (105 m²) | £199,500–£320,000 |
| Typical project (150 m²) | £285,000–£457,500 |
| Larger project (210 m²) | £399,000–£640,500 |
| Rate per m² | £1,900–£3,050 |
The main things that change the cost:
- Site access and demolition
- External works and landscaping
- Size and complexity of the house
- Services connections
Your exact price depends on the survey and drawings. The guide price tool gives a quick range in the meantime.
Do you need planning permission for a new build home in Nottingham?
The approval route for Nottingham is set by planning law in England. In England a new home needs full planning permission (or permission in principle followed by technical details consent). Councils assess design, access, neighbours and drainage, and the Community Infrastructure Levy may apply, though self-builders can claim an exemption before starting.
Building regulations approval comes from the council’s building control service or a registered building control approver. The work is inspected at key stages, such as foundations, drainage and insulation, and a completion certificate is issued at the end.
At the survey we check your house’s planning history and any restrictions, and tell you which route applies.
What we handle
Handled as part of most new build homes:
- Mechanical and electrical installation
- Groundworks, foundations and drainage
- Structural and services design
- Internal fit-out and finishes
- Superstructure, roof and windows
- Site appraisal and feasibility
How long does it take?
The build itself usually takes 9 to 14 months on site for a typical house. Allow time beforehand for drawings and approvals, usually 4 to 9 months.
Building in Nottingham
The East Midlands has a mix of red-brick terraces, inter-war semis and newer estates, so rear extensions and garage conversions are common projects.
If your home is in Nottingham or close by in West Bridgford, Arnold and Hucknall, a free home visit is the first step.
How it works
- 01
Free visit
We look at the property, talk through what you want and measure up. There is no charge and no obligation.
- 02
Drawings and written quote
We prepare the design and give you a written, itemised quote with inclusions and exclusions.
- 03
Approvals
Planning or permitted development confirmation, building regulations and any party wall matters.
- 04
Construction and completion
We build, put right any snags and hand over the building control certificate.
Questions about new build homes in Nottingham
Do I need planning permission?
Yes. A new dwelling always needs full planning permission (or permission in principle followed by technical details consent in England).
How much does a new build home cost in Nottingham?
In Nottingham, a new build home typically costs £1,900–£3,050 per m² of floor area (build cost), including VAT at 0% (zero-rated for qualifying new dwellings). A typical 150 m² project comes to roughly £285,000–£457,500. Your fixed price depends on the survey and drawings.
Do you build new build homes in Nottingham?
Yes. We build new build homes across Nottingham, including postcodes NG1, NG3 and NG7. Every project starts with a free home visit.
Is VAT charged on building a new house?
Construction services for a new dwelling are normally zero-rated when supplied by a VAT-registered builder. Self-builders who buy materials directly can reclaim VAT through HMRC’s DIY housebuilders scheme.
How long does a new build take?
A typical house takes 9 to 14 months on site after approvals.
