What is a new build home?

A new build home is a house built from the ground up on a cleared plot, a garden plot or a replacement-dwelling site. We work with plot owners and self-builders to design, gain approvals and build the house, either to a fixed design or from initial ideas.
How much does a new build home cost in Radcliffe?
In Radcliffe, a new build home typically costs £1,900–£3,000 per m² of floor area (build cost), including VAT at 0% (zero-rated for qualifying new dwellings). For a typical 150 m² project that is roughly £285,000–£450,000. The guide for Radcliffe reflects typical costs in the North West, roughly 6% below the UK-wide figure. Design, structural calculations and council fees are extra.
| Size or type | Guide range |
|---|---|
| Smaller project (105 m²) | £199,500–£315,000 |
| Typical project (150 m²) | £285,000–£450,000 |
| Larger project (210 m²) | £399,000–£630,000 |
| Rate per m² | £1,900–£3,000 |
What moves the price most:
- Specification and energy systems
- Size and complexity of the house
- External works and landscaping
- Site access and demolition
Your exact price depends on the survey and drawings. The guide price tool gives a quick range in the meantime.
Do you need planning permission for a new build home in Radcliffe?
Here is how the rules work for a new build home in England. In England a new home needs full planning permission (or permission in principle followed by technical details consent). Councils assess design, access, neighbours and drainage, and the Community Infrastructure Levy may apply, though self-builders can claim an exemption before starting.
Building regulations approval comes from the council’s building control service or a registered building control approver. The work is inspected at key stages, such as foundations, drainage and insulation, and a completion certificate is issued at the end.
If the answer is not clear-cut, we can apply for formal confirmation before you commit to the build.
What we handle
From survey to sign-off, the job normally involves:
- Mechanical and electrical installation
- Structural and services design
- Internal fit-out and finishes
- Superstructure, roof and windows
- Design and planning application
- Building control completion and warranty liaison
How long does it take?
Build time is typically 9 to 14 months on site for a typical house. Before that, surveys, drawings and approvals usually take 4 to 9 months, longer if the council asks for changes.
Building in Radcliffe
Terraced streets across the North West often suit rear dormers and single-storey kitchen extensions.
Radcliffe sits in Greater Manchester, about 7 miles north-west of Manchester. We cover the whole of Radcliffe, including postcodes M26.
How it works
- 01
Survey and brief
We visit, discuss your ideas and budget, and survey the property or site at no cost.
- 02
Drawings and written quote
We prepare the design and give you a written, itemised quote with inclusions and exclusions.
- 03
Approvals in place
We handle planning, building control and neighbour notices before work starts.
- 04
Build and sign-off
We run the build to a written programme and hand over the completion certificate.
Questions about new build homes in Radcliffe
How long does a new build take?
A typical house takes 9 to 14 months on site after approvals.
Is VAT charged on building a new house?
Construction services for a new dwelling are normally zero-rated when supplied by a VAT-registered builder. Self-builders who buy materials directly can reclaim VAT through HMRC’s DIY housebuilders scheme.
How much does a new build home cost in Radcliffe?
In Radcliffe, a new build home typically costs £1,900–£3,000 per m² of floor area (build cost), including VAT at 0% (zero-rated for qualifying new dwellings). A typical 150 m² project comes to roughly £285,000–£450,000. Your fixed price depends on the survey and drawings.
What warranty will a new home need?
Lenders usually require a structural warranty or a professional consultant’s certificate. The warranty is arranged before work starts, and the provider inspects the build at key stages.
Who approves a new build home in Radcliffe?
Planning matters in Radcliffe go to the council covering your address, and the work needs building control approval. We prepare and submit the applications for you.
