What is an orangery?

An orangery is an extension with brick or block piers, large areas of glazing and a solid perimeter roof around a central roof lantern. It sits between a conservatory and a traditional extension: brighter than an extension, warmer and more private than a conservatory.
How much does an orangery cost in Bangor, Gwynedd?
In Bangor, an orangery typically costs £2,200–£3,150 per m² of floor area, including VAT at 20% (standard rate). For a typical 16 m² project that is roughly £35,000–£50,500. That range is adjusted for Wales, where domestic building work typically costs around 8% below the national average. Design, structural calculations and council fees are extra.
| Size or type | Guide range |
|---|---|
| Smaller project (11 m²) | £24,000–£34,500 |
| Typical project (16 m²) | £35,000–£50,500 |
| Larger project (22 m²) | £48,500–£69,500 |
| Rate per m² | £2,200–£3,150 |
What moves the price most:
- Opening into the house
- Amount and type of glazing
- Heating and flooring
- Lantern size
A guide range is only a starting point: the guide price tool gives an instant figure for your size, and a free survey turns it into a fixed quote.
Do you need planning permission for an orangery in Bangor, Gwynedd?
Whether you need planning permission depends on your house and its location in Wales. In Wales a single-storey rear extension is often permitted development: up to 4 metres beyond the rear wall and up to 4 metres high, with eaves no higher than 3 metres within 2 metres of a boundary and no more than half the land around the original house covered. Wales has no larger home extension prior approval route, so deeper extensions need a planning application, as do extensions to flats, listed buildings and houses whose rights have been removed.
The Party Wall etc. Act 1996 applies in Wales, so notices must be served before work on a shared wall, on the boundary, or excavation close to a neighbour’s foundations.
At the survey we check your house’s planning history and any restrictions, and tell you which route applies.
What we handle
From survey to sign-off, the job normally involves:
- Flooring and decoration options
- French, sliding or bifold doors
- Building control sign-off where required
- Foundations and dwarf walls or piers
- Electrics, heating and plastering
- Insulated perimeter roof with internal pelmet
How long does it take?
The build itself usually takes 8 to 12 weeks on site. Design and approvals come first and typically take 6 to 12 weeks, depending on the approval route.
Building in Bangor, Gwynedd
Terraced houses in Welsh towns often have narrow plots, which suits rear and side return extensions and rear dormers.
If your home is in Bangor or close by in Caernarfon, Llandudno and Colwyn Bay, a free home visit is the first step.
How it works
- 01
Free visit
We look at the property, talk through what you want and measure up. There is no charge and no obligation.
- 02
Drawings and written quote
We prepare the design and give you a written, itemised quote with inclusions and exclusions.
- 03
Approvals in place
We handle planning, building control and neighbour notices before work starts.
- 04
Construction and completion
We build, put right any snags and hand over the building control certificate.
Questions about orangeries in Bangor, Gwynedd
Who approves an orangery in Bangor?
Planning matters in Bangor go to the council covering your address, and the work needs building control approval. We prepare and submit the applications for you.
Do I need planning permission for an orangery in Bangor?
In Wales a single-storey rear extension is often permitted development: up to 4 metres beyond the rear wall and up to 4 metres high, with eaves no higher than 3 metres within 2 metres of a boundary and no more than half the land around the original house covered. Wales has no larger home extension prior approval route, so deeper extensions need a planning application, as do extensions to flats, listed buildings and houses whose rights have been removed.
How much does an orangery cost in Bangor?
In Bangor, an orangery typically costs £2,200–£3,150 per m² of floor area, including VAT at 20% (standard rate). A typical 16 m² project comes to roughly £35,000–£50,500. Your fixed price depends on the survey and drawings.
Does an orangery need building regulations approval?
If it is open to the house or does not meet the conservatory exemption, yes. Most orangeries are treated as extensions and need building control approval, which we arrange.
Can an orangery replace a conservatory?
Yes. We can remove an old conservatory and build an orangery on new or upgraded foundations.
How long does it take?
Typically 8 to 12 weeks on site once approvals are in place.
