What is an orangery?

An orangery is an extension with brick or block piers, large areas of glazing and a solid perimeter roof around a central roof lantern. It sits between a conservatory and a traditional extension: brighter than an extension, warmer and more private than a conservatory.
How much does an orangery cost in Caerphilly?
In Caerphilly, an orangery typically costs £2,200–£3,150 per m² of floor area, including VAT at 20% (standard rate). For a typical 16 m² project that is roughly £35,000–£50,500. We start from a UK-wide guide and adjust it for Wales, where labour and materials are typically about 8% below average. Design, structural calculations and council fees are extra.
| Size or type | Guide range |
|---|---|
| Smaller project (11 m²) | £24,000–£34,500 |
| Typical project (16 m²) | £35,000–£50,500 |
| Larger project (22 m²) | £48,500–£69,500 |
| Rate per m² | £2,200–£3,150 |
What moves the price most:
- Amount and type of glazing
- Frame material and colour
- Size and shape of the footprint
- Lantern size
For a figure based on your own measurements, try the guide price tool, then book a free home visit for a fixed quote.
Do you need planning permission for an orangery in Caerphilly?
The approval route for Caerphilly is set by planning law in Wales. In Wales a single-storey rear extension is often permitted development: up to 4 metres beyond the rear wall and up to 4 metres high, with eaves no higher than 3 metres within 2 metres of a boundary and no more than half the land around the original house covered. Wales has no larger home extension prior approval route, so deeper extensions need a planning application, as do extensions to flats, listed buildings and houses whose rights have been removed.
Building regulations in Wales are set by the Welsh Government. Approval comes from the council’s building control service or a registered building control approver, with inspections during the work and a completion certificate at the end.
If the answer is not clear-cut, we can apply for formal confirmation before you commit to the build.
What we handle
Handled as part of most orangeries:
- Design to suit the style of the house
- French, sliding or bifold doors
- Roof lantern and glazed panels
- Flooring and decoration options
- Electrics, heating and plastering
- Foundations and dwarf walls or piers
How long does it take?
Expect 8 to 12 weeks on site. Design and approvals come first and typically take 6 to 12 weeks, depending on the approval route.
Building in Caerphilly
Terraced houses in Welsh towns often have narrow plots, which suits rear and side return extensions and rear dormers.
Projects in Caerphilly (CF83) are surveyed in person before we quote, so the price reflects your actual property.
How it works
- 01
Survey and brief
We visit, discuss your ideas and budget, and survey the property or site at no cost.
- 02
Drawings and written quote
We prepare the design and give you a written, itemised quote with inclusions and exclusions.
- 03
Permissions sorted
Applications, building control and neighbour arrangements, all before the start date.
- 04
Construction and completion
We build, put right any snags and hand over the building control certificate.
Questions about orangeries in Caerphilly
How much does an orangery cost in Caerphilly?
In Caerphilly, an orangery typically costs £2,200–£3,150 per m² of floor area, including VAT at 20% (standard rate). A typical 16 m² project comes to roughly £35,000–£50,500. Your fixed price depends on the survey and drawings.
Does an orangery need building regulations approval?
If it is open to the house or does not meet the conservatory exemption, yes. Most orangeries are treated as extensions and need building control approval, which we arrange.
Do you build orangeries in Caerphilly?
Yes. We build orangeries across Caerphilly, including postcodes CF83. Every project starts with a free home visit.
Do I need planning permission for an orangery in Caerphilly?
In Wales a single-storey rear extension is often permitted development: up to 4 metres beyond the rear wall and up to 4 metres high, with eaves no higher than 3 metres within 2 metres of a boundary and no more than half the land around the original house covered. Wales has no larger home extension prior approval route, so deeper extensions need a planning application, as do extensions to flats, listed buildings and houses whose rights have been removed.
How long does it take?
Typically 8 to 12 weeks on site once approvals are in place.
What is the difference between an orangery and a conservatory?
An orangery has a solid roof around a central lantern and more brickwork, while a conservatory is mostly glazed. Orangeries are usually warmer in winter and cooler in summer.
