What is an orangery?

An orangery is an extension with brick or block piers, large areas of glazing and a solid perimeter roof around a central roof lantern. It sits between a conservatory and a traditional extension: brighter than an extension, warmer and more private than a conservatory.
How much does an orangery cost in Chepstow?
In Chepstow, an orangery typically costs £2,200–£3,150 per m² of floor area, including VAT at 20% (standard rate). For a typical 16 m² project that is roughly £35,000–£50,500. Building costs in Wales run about 8% below the UK average, and the figures for Chepstow are adjusted to reflect that. Design, structural calculations and council fees are extra.
| Size or type | Guide range |
|---|---|
| Smaller project (11 m²) | £24,000–£34,500 |
| Typical project (16 m²) | £35,000–£50,500 |
| Larger project (22 m²) | £48,500–£69,500 |
| Rate per m² | £2,200–£3,150 |
What moves the price most:
- Amount and type of glazing
- Opening into the house
- Frame material and colour
- Heating and flooring
A guide range is only a starting point: the guide price tool gives an instant figure for your size, and a free survey turns it into a fixed quote.
Do you need planning permission for an orangery in Chepstow?
The approval route for Chepstow is set by planning law in Wales. In Wales a single-storey rear extension is often permitted development: up to 4 metres beyond the rear wall and up to 4 metres high, with eaves no higher than 3 metres within 2 metres of a boundary and no more than half the land around the original house covered. Wales has no larger home extension prior approval route, so deeper extensions need a planning application, as do extensions to flats, listed buildings and houses whose rights have been removed.
Building regulations in Wales are set by the Welsh Government. Approval comes from the council’s building control service or a registered building control approver, with inspections during the work and a completion certificate at the end.
We check this for your address before design work starts, so there are no surprises later.
What we handle
From survey to sign-off, the job normally involves:
- Design to suit the style of the house
- Building control sign-off where required
- Electrics, heating and plastering
- French, sliding or bifold doors
- Roof lantern and glazed panels
- Insulated perimeter roof with internal pelmet
How long does it take?
Allow 8 to 12 weeks on site. Before that, surveys, drawings and approvals usually take 6 to 12 weeks, longer if the council asks for changes.
Building in Chepstow
Wales has many terraced valley streets, stone cottages and post-war estates, so extension designs are shaped by slopes, materials and local character.
We work across Chepstow and neighbouring areas such as Caldicot, Monmouth and Newport. Postcodes we cover in Chepstow include NP16.
How it works
- 01
Free visit
We look at the property, talk through what you want and measure up. There is no charge and no obligation.
- 02
Drawings and written quote
We prepare the design and give you a written, itemised quote with inclusions and exclusions.
- 03
Approvals
Planning or permitted development confirmation, building regulations and any party wall matters.
- 04
Build and sign-off
We run the build to a written programme and hand over the completion certificate.
Questions about orangeries in Chepstow
How much does an orangery cost in Chepstow?
In Chepstow, an orangery typically costs £2,200–£3,150 per m² of floor area, including VAT at 20% (standard rate). A typical 16 m² project comes to roughly £35,000–£50,500. Your fixed price depends on the survey and drawings.
How long does it take?
Typically 8 to 12 weeks on site once approvals are in place.
Does an orangery need building regulations approval?
If it is open to the house or does not meet the conservatory exemption, yes. Most orangeries are treated as extensions and need building control approval, which we arrange.
Do you build orangeries in Chepstow?
Yes. We build orangeries across Chepstow, including postcodes NP16. Every project starts with a free home visit.
Do I need planning permission for an orangery in Chepstow?
In Wales a single-storey rear extension is often permitted development: up to 4 metres beyond the rear wall and up to 4 metres high, with eaves no higher than 3 metres within 2 metres of a boundary and no more than half the land around the original house covered. Wales has no larger home extension prior approval route, so deeper extensions need a planning application, as do extensions to flats, listed buildings and houses whose rights have been removed.
Can an orangery replace a conservatory?
Yes. We can remove an old conservatory and build an orangery on new or upgraded foundations.
