What is an orangery?

An orangery is an extension with brick or block piers, large areas of glazing and a solid perimeter roof around a central roof lantern. It sits between a conservatory and a traditional extension: brighter than an extension, warmer and more private than a conservatory.
How much does an orangery cost in Croydon?
In Croydon, an orangery typically costs £3,100–£4,400 per m² of floor area, including VAT at 20% (standard rate). For a typical 16 m² project that is roughly £49,500–£70,500. Building costs in London run about 30% above the UK average, and the figures for Croydon are adjusted to reflect that. Design, structural calculations and council fees are extra.
| Size or type | Guide range |
|---|---|
| Smaller project (11 m²) | £34,000–£48,500 |
| Typical project (16 m²) | £49,500–£70,500 |
| Larger project (22 m²) | £68,000–£97,000 |
| Rate per m² | £3,100–£4,400 |
The main things that change the cost:
- Lantern size
- Amount and type of glazing
- Heating and flooring
- Frame material and colour
Your exact price depends on the survey and drawings. The guide price tool gives a quick range in the meantime.
Do you need planning permission for an orangery in Croydon?
Before anything is built in Croydon, we confirm which approvals apply in England. In England a single-storey rear extension is often permitted development: broadly up to 3 metres deep on a semi-detached or terraced house and 4 metres on a detached house, no higher than 4 metres, with eaves no higher than 3 metres within 2 metres of a boundary, and covering no more than half the garden. The larger home extension scheme allows up to 6 or 8 metres if you notify the council first and neighbours have a chance to comment. In conservation areas, National Parks and National Landscapes the larger home extension route, side extensions and cladding are not permitted development. Flats and houses whose rights have been removed need a planning application, and listed buildings need listed building consent.
Building regulations approval comes from the council’s building control service or a registered building control approver. The work is inspected at key stages, such as foundations, drainage and insulation, and a completion certificate is issued at the end.
If the answer is not clear-cut, we can apply for formal confirmation before you commit to the build.
What we handle
On a typical orangery we handle:
- Building control sign-off where required
- Design to suit the style of the house
- Flooring and decoration options
- Foundations and dwarf walls or piers
- Electrics, heating and plastering
- Insulated perimeter roof with internal pelmet
How long does it take?
Build time is typically 8 to 12 weeks on site. Design and approvals come first and typically take 6 to 12 weeks, depending on the approval route.
Building in Croydon
Victorian and Edwardian terraces dominate many London streets, which is why side return, wraparound and mansard projects are so common here.
Our Croydon coverage includes postcode districts CR0, CR7, CR9 and CR90, and we also work in nearby places such as Carshalton, Wallington and Mitcham.
How it works
- 01
Visit and measured survey
A free visit to understand the project, check access and take measurements.
- 02
Design and pricing
Design options, then a fixed quote based on the chosen drawings and specification.
- 03
Permissions sorted
Applications, building control and neighbour arrangements, all before the start date.
- 04
Build and handover
Work follows the agreed programme, with inspections along the way and a completion certificate at the end.
Questions about orangeries in Croydon
How much does an orangery cost in Croydon?
In Croydon, an orangery typically costs £3,100–£4,400 per m² of floor area, including VAT at 20% (standard rate). A typical 16 m² project comes to roughly £49,500–£70,500. Your fixed price depends on the survey and drawings.
Can an orangery replace a conservatory?
Yes. We can remove an old conservatory and build an orangery on new or upgraded foundations.
Who approves an orangery in Croydon?
Planning matters in Croydon go to the council covering your address, and the work needs building control approval. We prepare and submit the applications for you.
How long does it take?
Typically 8 to 12 weeks on site once approvals are in place.
Does an orangery need building regulations approval?
If it is open to the house or does not meet the conservatory exemption, yes. Most orangeries are treated as extensions and need building control approval, which we arrange.