SK Developments Free home visit0800 088 6248 Get a quote

Argyll and ButeOrangeries

Orangeries in Dunoon

If you live in Dunoon and need more space, an orangery may be the answer. We survey the house, prepare the design and build it, with a fixed price for the agreed specification.

Guide price in Dunoon

£2,350–£3,300 per m² of floor area

In Dunoon, an orangery typically costs £2,350–£3,300 per m² of floor area, including VAT at 20% (standard rate). For a typical 16 m² project that is roughly £37,500–£53,000.

Book a free home visit

Tell us about your project. We reply to arrange a visit and a fixed quote.

Free home visit and measured survey
Fixed price for the agreed specification
Drawings, approvals and build in one contract
Building control sign-off arranged
England, Wales, Scotland and Northern Ireland

What is an orangery?

Brick orangery with white French doors, glazed panels and a central roof lantern at sunset

An orangery is an extension with brick or block piers, large areas of glazing and a solid perimeter roof around a central roof lantern. It sits between a conservatory and a traditional extension: brighter than an extension, warmer and more private than a conservatory.

How much does an orangery cost in Dunoon?

In Dunoon, an orangery typically costs £2,350–£3,300 per m² of floor area, including VAT at 20% (standard rate). For a typical 16 m² project that is roughly £37,500–£53,000. Island and remote projects usually cost more than this guide because of shipping, travel and accommodation. Design, structural calculations and council fees are extra.

Guide prices for Dunoon, including VAT at 20% (standard rate)
Size or typeGuide range
Smaller project (11 m²)£26,000–£36,500
Typical project (16 m²)£37,500–£53,000
Larger project (22 m²)£51,500–£72,500
Rate per m²£2,350–£3,300

The main things that change the cost:

  • Lantern size
  • Frame material and colour
  • Heating and flooring
  • Size and shape of the footprint

For a figure based on your own measurements, try the guide price tool, then book a free home visit for a fixed quote.

Do you need planning permission for an orangery in Dunoon?

The approval route for Dunoon is set by planning law in Scotland. In Scotland a single-storey extension is often permitted development (Class 1A): where any part is within 1 metre of a boundary, it can project up to 3 metres from the rear wall of a terraced house or 4 metres on other houses, with eaves no higher than 3 metres, an overall height of 4 metres and no more than half the front or rear garden covered. The rights do not apply in conservation areas or to flats, and a building warrant will usually still be needed before work starts.

Scotland has no Party Wall Act. Work on shared walls is governed by your title deeds, the Tenements (Scotland) Act 2004 for flats, and common law, so we agree arrangements with neighbours in writing before work starts.

We check this for your address before design work starts, so there are no surprises later.

What we handle

From survey to sign-off, the job normally involves:

  • French, sliding or bifold doors
  • Design to suit the style of the house
  • Foundations and dwarf walls or piers
  • Flooring and decoration options
  • Building control sign-off where required
  • Insulated perimeter roof with internal pelmet

How long does it take?

The build itself usually takes 8 to 12 weeks on site. Design and approvals come first and typically take 6 to 12 weeks, depending on the approval route.

Building in Dunoon

Scotland’s housing ranges from sandstone tenements and villas to post-war and modern estates, and the building warrant system shapes how projects are planned.

Projects in Dunoon are taken on by arrangement. We confirm availability first, and any travel or accommodation costs are shown separately in the quote.

How it works

  1. 01

    Free visit

    We look at the property, talk through what you want and measure up. There is no charge and no obligation.

  2. 02

    Design and pricing

    Design options, then a fixed quote based on the chosen drawings and specification.

  3. 03

    Approvals

    Planning or permitted development confirmation, building regulations and any party wall matters.

  4. 04

    Construction and completion

    We build, put right any snags and hand over the building control certificate.

Questions about orangeries in Dunoon

How much does an orangery cost in Dunoon?

In Dunoon, an orangery typically costs £2,350–£3,300 per m² of floor area, including VAT at 20% (standard rate). A typical 16 m² project comes to roughly £37,500–£53,000. Your fixed price depends on the survey and drawings.

Can an orangery replace a conservatory?

Yes. We can remove an old conservatory and build an orangery on new or upgraded foundations.

Do I need planning permission for an orangery in Dunoon?

In Scotland a single-storey extension is often permitted development (Class 1A): where any part is within 1 metre of a boundary, it can project up to 3 metres from the rear wall of a terraced house or 4 metres on other houses, with eaves no higher than 3 metres, an overall height of 4 metres and no more than half the front or rear garden covered. The rights do not apply in conservation areas or to flats, and a building warrant will usually still be needed before work starts.

What is the difference between an orangery and a conservatory?

An orangery has a solid roof around a central lantern and more brickwork, while a conservatory is mostly glazed. Orangeries are usually warmer in winter and cooler in summer.

Can it be used all year?

Yes. With an insulated roof, efficient glazing and heating, an orangery is comfortable all year.

How long does an orangery take in Dunoon?

Typically 8 to 12 weeks on site. Design and approvals beforehand usually take 6 to 12 weeks.

Get a free, no-obligation home visit for your orangery in Dunoon.

Call 0800 088 6248 or get an instant guide price online.

Call 0800 088 6248Get a guide price