What is an orangery?

An orangery is an extension with brick or block piers, large areas of glazing and a solid perimeter roof around a central roof lantern. It sits between a conservatory and a traditional extension: brighter than an extension, warmer and more private than a conservatory.
How much does an orangery cost in Harpenden?
In Harpenden, an orangery typically costs £2,550–£3,600 per m² of floor area, including VAT at 20% (standard rate). For a typical 16 m² project that is roughly £41,000–£57,500. Building costs in the East of England run about 6% above the UK average, and the figures for Harpenden are adjusted to reflect that. Design, structural calculations and council fees are extra.
| Size or type | Guide range |
|---|---|
| Smaller project (11 m²) | £28,000–£39,500 |
| Typical project (16 m²) | £41,000–£57,500 |
| Larger project (22 m²) | £56,000–£79,000 |
| Rate per m² | £2,550–£3,600 |
The main things that change the cost:
- Frame material and colour
- Amount and type of glazing
- Lantern size
- Size and shape of the footprint
For a figure based on your own measurements, try the guide price tool, then book a free home visit for a fixed quote.
Do you need planning permission for an orangery in Harpenden?
Whether you need planning permission depends on your house and its location in England. In England a single-storey rear extension is often permitted development: broadly up to 3 metres deep on a semi-detached or terraced house and 4 metres on a detached house, no higher than 4 metres, with eaves no higher than 3 metres within 2 metres of a boundary, and covering no more than half the garden. The larger home extension scheme allows up to 6 or 8 metres if you notify the council first and neighbours have a chance to comment. In conservation areas, National Parks and National Landscapes the larger home extension route, side extensions and cladding are not permitted development. Flats and houses whose rights have been removed need a planning application, and listed buildings need listed building consent.
Where work involves a shared wall, building on the boundary, or digging foundations within 3 metres of a neighbour’s building and deeper than its foundations (or within 6 metres for deeper work), the Party Wall etc. Act 1996 applies and notices must be served before work starts.
If the answer is not clear-cut, we can apply for formal confirmation before you commit to the build.
What we handle
On a typical orangery we handle:
- Design to suit the style of the house
- Flooring and decoration options
- Roof lantern and glazed panels
- Electrics, heating and plastering
- Foundations and dwarf walls or piers
- French, sliding or bifold doors
How long does it take?
The build itself usually takes 8 to 12 weeks on site. Design and approvals come first and typically take 6 to 12 weeks, depending on the approval route.
Building in Harpenden
Many towns in the East of England have estates built since the 1970s, where garage conversions and rear extensions are popular.
Harpenden sits in Hertfordshire, about 12 miles west of Hertford. We cover the whole of Harpenden, including postcodes AL5.
How it works
- 01
Survey and brief
We visit, discuss your ideas and budget, and survey the property or site at no cost.
- 02
Design and fixed quote
Drawings, structural calculations and an itemised, fixed price for the agreed specification.
- 03
Permissions sorted
Applications, building control and neighbour arrangements, all before the start date.
- 04
Build and sign-off
We run the build to a written programme and hand over the completion certificate.
Questions about orangeries in Harpenden
Can an orangery replace a conservatory?
Yes. We can remove an old conservatory and build an orangery on new or upgraded foundations.
Do you build orangeries in Harpenden?
Yes. We build orangeries across Harpenden, including postcodes AL5. Every project starts with a free home visit.
How much does an orangery cost in Harpenden?
In Harpenden, an orangery typically costs £2,550–£3,600 per m² of floor area, including VAT at 20% (standard rate). A typical 16 m² project comes to roughly £41,000–£57,500. Your fixed price depends on the survey and drawings.
Does an orangery need planning permission?
The same rules as a single-storey extension apply. Many are permitted development, depending on depth, height and your house’s location.
Can it be used all year?
Yes. With an insulated roof, efficient glazing and heating, an orangery is comfortable all year.