What is an orangery?

An orangery is an extension with brick or block piers, large areas of glazing and a solid perimeter roof around a central roof lantern. It sits between a conservatory and a traditional extension: brighter than an extension, warmer and more private than a conservatory.
How much does an orangery cost in Inverurie?
In Inverurie, an orangery typically costs £2,350–£3,300 per m² of floor area, including VAT at 20% (standard rate). For a typical 16 m² project that is roughly £37,500–£53,000. Prices in Scotland sit near the national average for this kind of work, and the range for Inverurie reflects that. Design, structural calculations and council fees are extra.
| Size or type | Guide range |
|---|---|
| Smaller project (11 m²) | £26,000–£36,500 |
| Typical project (16 m²) | £37,500–£53,000 |
| Larger project (22 m²) | £51,500–£72,500 |
| Rate per m² | £2,350–£3,300 |
The main things that change the cost:
- Size and shape of the footprint
- Opening into the house
- Frame material and colour
- Lantern size
Your exact price depends on the survey and drawings. The guide price tool gives a quick range in the meantime.
Do you need planning permission for an orangery in Inverurie?
Before anything is built in Inverurie, we confirm which approvals apply in Scotland. In Scotland a single-storey extension is often permitted development (Class 1A): where any part is within 1 metre of a boundary, it can project up to 3 metres from the rear wall of a terraced house or 4 metres on other houses, with eaves no higher than 3 metres, an overall height of 4 metres and no more than half the front or rear garden covered. The rights do not apply in conservation areas or to flats, and a building warrant will usually still be needed before work starts.
Scotland has no Party Wall Act. Work on shared walls is governed by your title deeds, the Tenements (Scotland) Act 2004 for flats, and common law, so we agree arrangements with neighbours in writing before work starts.
At the survey we check your house’s planning history and any restrictions, and tell you which route applies.
What we handle
Handled as part of most orangeries:
- Building control sign-off where required
- Design to suit the style of the house
- Flooring and decoration options
- Roof lantern and glazed panels
- Foundations and dwarf walls or piers
- Electrics, heating and plastering
How long does it take?
Expect 8 to 12 weeks on site. Before that, surveys, drawings and approvals usually take 6 to 12 weeks, longer if the council asks for changes.
Building in Inverurie
Scotland’s housing ranges from sandstone tenements and villas to post-war and modern estates, and the building warrant system shapes how projects are planned.
Our Inverurie coverage includes postcode districts AB51, and we also work in nearby places such as Westhill, Aberdeen and Stonehaven.
How it works
- 01
Free visit
We look at the property, talk through what you want and measure up. There is no charge and no obligation.
- 02
Design and pricing
Design options, then a fixed quote based on the chosen drawings and specification.
- 03
Approvals in place
We handle planning, building control and neighbour notices before work starts.
- 04
Construction and completion
We build, put right any snags and hand over the building control certificate.
Questions about orangeries in Inverurie
Can an orangery replace a conservatory?
Yes. We can remove an old conservatory and build an orangery on new or upgraded foundations.
Who approves an orangery in Inverurie?
Planning matters in Inverurie go to the council covering your address, and the work needs a building warrant. We prepare and submit the applications for you.
Can it be used all year?
Yes. With an insulated roof, efficient glazing and heating, an orangery is comfortable all year.
How much does an orangery cost in Inverurie?
In Inverurie, an orangery typically costs £2,350–£3,300 per m² of floor area, including VAT at 20% (standard rate). A typical 16 m² project comes to roughly £37,500–£53,000. Your fixed price depends on the survey and drawings.
Do I need planning permission for an orangery in Inverurie?
In Scotland a single-storey extension is often permitted development (Class 1A): where any part is within 1 metre of a boundary, it can project up to 3 metres from the rear wall of a terraced house or 4 metres on other houses, with eaves no higher than 3 metres, an overall height of 4 metres and no more than half the front or rear garden covered. The rights do not apply in conservation areas or to flats, and a building warrant will usually still be needed before work starts.
How long does it take?
Typically 8 to 12 weeks on site once approvals are in place.
