SK Developments Free home visit0800 088 6248 Get a quote

AyrshireOrangeries

Orangeries in Irvine

SK Developments designs, gets approval for and builds orangeries in Irvine and across Ayrshire, with one contract from the first drawing to the building control sign-off.

Guide price in Irvine

£2,350–£3,300 per m² of floor area

In Irvine, an orangery typically costs £2,350–£3,300 per m² of floor area, including VAT at 20% (standard rate). For a typical 16 m² project that is roughly £37,500–£53,000.

Book a free home visit

Tell us about your project. We reply to arrange a visit and a fixed quote.

Free home visit and measured survey
Fixed price for the agreed specification
Drawings, approvals and build in one contract
Building control sign-off arranged
England, Wales, Scotland and Northern Ireland

What is an orangery?

Brick orangery with white French doors, glazed panels and a central roof lantern at sunset

An orangery is an extension with brick or block piers, large areas of glazing and a solid perimeter roof around a central roof lantern. It sits between a conservatory and a traditional extension: brighter than an extension, warmer and more private than a conservatory.

How much does an orangery cost in Irvine?

In Irvine, an orangery typically costs £2,350–£3,300 per m² of floor area, including VAT at 20% (standard rate). For a typical 16 m² project that is roughly £37,500–£53,000. Building costs in Scotland are close to the UK average, so the figures for Irvine are close to our national guide. Design, structural calculations and council fees are extra.

Guide prices for Irvine, including VAT at 20% (standard rate)
Size or typeGuide range
Smaller project (11 m²)£26,000–£36,500
Typical project (16 m²)£37,500–£53,000
Larger project (22 m²)£51,500–£72,500
Rate per m²£2,350–£3,300

Your quote will depend mainly on:

  • Frame material and colour
  • Lantern size
  • Opening into the house
  • Heating and flooring

Your exact price depends on the survey and drawings. The guide price tool gives a quick range in the meantime.

Do you need planning permission for an orangery in Irvine?

Whether you need planning permission depends on your house and its location in Scotland. In Scotland a single-storey extension is often permitted development (Class 1A): where any part is within 1 metre of a boundary, it can project up to 3 metres from the rear wall of a terraced house or 4 metres on other houses, with eaves no higher than 3 metres, an overall height of 4 metres and no more than half the front or rear garden covered. The rights do not apply in conservation areas or to flats, and a building warrant will usually still be needed before work starts.

Scotland has no Party Wall Act. Work on shared walls is governed by your title deeds, the Tenements (Scotland) Act 2004 for flats, and common law, so we agree arrangements with neighbours in writing before work starts.

We check this for your address before design work starts, so there are no surprises later.

What we handle

Handled as part of most orangeries:

  • Insulated perimeter roof with internal pelmet
  • French, sliding or bifold doors
  • Electrics, heating and plastering
  • Building control sign-off where required
  • Design to suit the style of the house
  • Flooring and decoration options

How long does it take?

Allow 8 to 12 weeks on site. Before that, surveys, drawings and approvals usually take 6 to 12 weeks, longer if the council asks for changes.

Building in Irvine

Scotland’s housing ranges from sandstone tenements and villas to post-war and modern estates, and the building warrant system shapes how projects are planned.

From KA12 outwards, we take on projects throughout Irvine and the surrounding parts of Ayrshire.

How it works

  1. 01

    Survey and brief

    We visit, discuss your ideas and budget, and survey the property or site at no cost.

  2. 02

    Drawings and written quote

    We prepare the design and give you a written, itemised quote with inclusions and exclusions.

  3. 03

    Approvals in place

    We handle planning, building control and neighbour notices before work starts.

  4. 04

    Construction and completion

    We build, put right any snags and hand over the building control certificate.

Questions about orangeries in Irvine

Does an orangery need building regulations approval?

If it is open to the house or does not meet the conservatory exemption, yes. Most orangeries are treated as extensions and need building control approval, which we arrange.

Can it be used all year?

Yes. With an insulated roof, efficient glazing and heating, an orangery is comfortable all year.

Do I need planning permission for an orangery in Irvine?

In Scotland a single-storey extension is often permitted development (Class 1A): where any part is within 1 metre of a boundary, it can project up to 3 metres from the rear wall of a terraced house or 4 metres on other houses, with eaves no higher than 3 metres, an overall height of 4 metres and no more than half the front or rear garden covered. The rights do not apply in conservation areas or to flats, and a building warrant will usually still be needed before work starts.

How long does an orangery take in Irvine?

Typically 8 to 12 weeks on site. Design and approvals beforehand usually take 6 to 12 weeks.

Can an orangery replace a conservatory?

Yes. We can remove an old conservatory and build an orangery on new or upgraded foundations.

How much does an orangery cost in Irvine?

In Irvine, an orangery typically costs £2,350–£3,300 per m² of floor area, including VAT at 20% (standard rate). A typical 16 m² project comes to roughly £37,500–£53,000. Your fixed price depends on the survey and drawings.

Ready to talk about an orangery in Irvine? Book a free home visit or get an instant guide price.

Call 0800 088 6248 or get an instant guide price online.

Call 0800 088 6248Get a guide price