What is an orangery?

An orangery is an extension with brick or block piers, large areas of glazing and a solid perimeter roof around a central roof lantern. It sits between a conservatory and a traditional extension: brighter than an extension, warmer and more private than a conservatory.
How much does an orangery cost in Northwich?
In Northwich, an orangery typically costs £2,250–£3,200 per m² of floor area, including VAT at 20% (standard rate). For a typical 16 m² project that is roughly £36,000–£51,000. Prices across the North West are typically 6% below the UK average for this kind of work, which is reflected in the range for Northwich. Design, structural calculations and council fees are extra.
| Size or type | Guide range |
|---|---|
| Smaller project (11 m²) | £25,000–£35,000 |
| Typical project (16 m²) | £36,000–£51,000 |
| Larger project (22 m²) | £49,500–£70,500 |
| Rate per m² | £2,250–£3,200 |
What moves the price most:
- Size and shape of the footprint
- Heating and flooring
- Lantern size
- Opening into the house
A guide range is only a starting point: the guide price tool gives an instant figure for your size, and a free survey turns it into a fixed quote.
Do you need planning permission for an orangery in Northwich?
Here is how the rules work for an orangery in England. In England a single-storey rear extension is often permitted development: broadly up to 3 metres deep on a semi-detached or terraced house and 4 metres on a detached house, no higher than 4 metres, with eaves no higher than 3 metres within 2 metres of a boundary, and covering no more than half the garden. The larger home extension scheme allows up to 6 or 8 metres if you notify the council first and neighbours have a chance to comment. In conservation areas, National Parks and National Landscapes the larger home extension route, side extensions and cladding are not permitted development. Flats and houses whose rights have been removed need a planning application, and listed buildings need listed building consent.
Building regulations approval comes from the council’s building control service or a registered building control approver. The work is inspected at key stages, such as foundations, drainage and insulation, and a completion certificate is issued at the end.
At the survey we check your house’s planning history and any restrictions, and tell you which route applies.
What we handle
From survey to sign-off, the job normally involves:
- Building control sign-off where required
- Insulated perimeter roof with internal pelmet
- Flooring and decoration options
- Foundations and dwarf walls or piers
- Electrics, heating and plastering
- Design to suit the style of the house
How long does it take?
The build itself usually takes 8 to 12 weeks on site. Before that, surveys, drawings and approvals usually take 6 to 12 weeks, longer if the council asks for changes.
Building in Northwich
The North West has many brick terraces and inter-war semis, where kitchen extensions and dormer loft conversions add space without moving.
Northwich sits in Cheshire, about 16 miles east of Chester. We cover the whole of Northwich, including postcodes CW9.
How it works
- 01
Survey and brief
We visit, discuss your ideas and budget, and survey the property or site at no cost.
- 02
Drawings and written quote
We prepare the design and give you a written, itemised quote with inclusions and exclusions.
- 03
Approvals
Planning or permitted development confirmation, building regulations and any party wall matters.
- 04
Construction and completion
We build, put right any snags and hand over the building control certificate.
Questions about orangeries in Northwich
Can an orangery replace a conservatory?
Yes. We can remove an old conservatory and build an orangery on new or upgraded foundations.
Can it be used all year?
Yes. With an insulated roof, efficient glazing and heating, an orangery is comfortable all year.
How much does an orangery cost in Northwich?
In Northwich, an orangery typically costs £2,250–£3,200 per m² of floor area, including VAT at 20% (standard rate). A typical 16 m² project comes to roughly £36,000–£51,000. Your fixed price depends on the survey and drawings.
How long does it take?
Typically 8 to 12 weeks on site once approvals are in place.
Who approves an orangery in Northwich?
Planning matters in Northwich go to the council covering your address, and the work needs building control approval. We prepare and submit the applications for you.