What is an orangery?

An orangery is an extension with brick or block piers, large areas of glazing and a solid perimeter roof around a central roof lantern. It sits between a conservatory and a traditional extension: brighter than an extension, warmer and more private than a conservatory.
How much does an orangery cost in Peckham?
In Peckham, an orangery typically costs £3,100–£4,400 per m² of floor area, including VAT at 20% (standard rate). For a typical 16 m² project that is roughly £49,500–£70,500. The guide for Peckham reflects typical costs in London, roughly 30% above the UK-wide figure. Design, structural calculations and council fees are extra.
| Size or type | Guide range |
|---|---|
| Smaller project (11 m²) | £34,000–£48,500 |
| Typical project (16 m²) | £49,500–£70,500 |
| Larger project (22 m²) | £68,000–£97,000 |
| Rate per m² | £3,100–£4,400 |
The biggest cost drivers are:
- Lantern size
- Heating and flooring
- Frame material and colour
- Opening into the house
A guide range is only a starting point: the guide price tool gives an instant figure for your size, and a free survey turns it into a fixed quote.
Do you need planning permission for an orangery in Peckham?
Here is how the rules work for an orangery in England. In England a single-storey rear extension is often permitted development: broadly up to 3 metres deep on a semi-detached or terraced house and 4 metres on a detached house, no higher than 4 metres, with eaves no higher than 3 metres within 2 metres of a boundary, and covering no more than half the garden. The larger home extension scheme allows up to 6 or 8 metres if you notify the council first and neighbours have a chance to comment. In conservation areas, National Parks and National Landscapes the larger home extension route, side extensions and cladding are not permitted development. Flats and houses whose rights have been removed need a planning application, and listed buildings need listed building consent.
Building regulations approval comes from the council’s building control service or a registered building control approver. The work is inspected at key stages, such as foundations, drainage and insulation, and a completion certificate is issued at the end.
We check this for your address before design work starts, so there are no surprises later.
What we handle
From survey to sign-off, the job normally involves:
- Flooring and decoration options
- Design to suit the style of the house
- Foundations and dwarf walls or piers
- Electrics, heating and plastering
- Building control sign-off where required
- French, sliding or bifold doors
How long does it take?
Allow 8 to 12 weeks on site. Before that, surveys, drawings and approvals usually take 6 to 12 weeks, longer if the council asks for changes.
Building in Peckham
Many London boroughs have conservation areas and detailed design guides, so early design advice saves time at the planning stage.
Our Peckham coverage includes postcode districts SE15, and we also work in nearby places such as Lewisham, Bermondsey and Brixton.
How it works
- 01
Survey and brief
We visit, discuss your ideas and budget, and survey the property or site at no cost.
- 02
Design and pricing
Design options, then a fixed quote based on the chosen drawings and specification.
- 03
Approvals in place
We handle planning, building control and neighbour notices before work starts.
- 04
Build and handover
Work follows the agreed programme, with inspections along the way and a completion certificate at the end.
Questions about orangeries in Peckham
Can it be used all year?
Yes. With an insulated roof, efficient glazing and heating, an orangery is comfortable all year.
How long does it take?
Typically 8 to 12 weeks on site once approvals are in place.
How much does an orangery cost in Peckham?
In Peckham, an orangery typically costs £3,100–£4,400 per m² of floor area, including VAT at 20% (standard rate). A typical 16 m² project comes to roughly £49,500–£70,500. Your fixed price depends on the survey and drawings.
Does an orangery need building regulations approval?
If it is open to the house or does not meet the conservatory exemption, yes. Most orangeries are treated as extensions and need building control approval, which we arrange.
Who approves an orangery in Peckham?
Planning matters in Peckham go to the council covering your address, and the work needs building control approval. We prepare and submit the applications for you.