What is an orangery?

An orangery is an extension with brick or block piers, large areas of glazing and a solid perimeter roof around a central roof lantern. It sits between a conservatory and a traditional extension: brighter than an extension, warmer and more private than a conservatory.
How much does an orangery cost in Pembroke Dock?
In Pembroke Dock, an orangery typically costs £2,200–£3,150 per m² of floor area, including VAT at 20% (standard rate). For a typical 16 m² project that is roughly £35,000–£50,500. Building costs in Wales run about 8% below the UK average, and the figures for Pembroke Dock are adjusted to reflect that. Design, structural calculations and council fees are extra.
| Size or type | Guide range |
|---|---|
| Smaller project (11 m²) | £24,000–£34,500 |
| Typical project (16 m²) | £35,000–£50,500 |
| Larger project (22 m²) | £48,500–£69,500 |
| Rate per m² | £2,200–£3,150 |
The main things that change the cost:
- Size and shape of the footprint
- Frame material and colour
- Heating and flooring
- Lantern size
Your exact price depends on the survey and drawings. The guide price tool gives a quick range in the meantime.
Do you need planning permission for an orangery in Pembroke Dock?
The approval route for Pembroke Dock is set by planning law in Wales. In Wales a single-storey rear extension is often permitted development: up to 4 metres beyond the rear wall and up to 4 metres high, with eaves no higher than 3 metres within 2 metres of a boundary and no more than half the land around the original house covered. Wales has no larger home extension prior approval route, so deeper extensions need a planning application, as do extensions to flats, listed buildings and houses whose rights have been removed.
The Party Wall etc. Act 1996 applies in Wales, so notices must be served before work on a shared wall, on the boundary, or excavation close to a neighbour’s foundations.
We check this for your address before design work starts, so there are no surprises later.
What we handle
What we take care of:
- Foundations and dwarf walls or piers
- French, sliding or bifold doors
- Electrics, heating and plastering
- Design to suit the style of the house
- Insulated perimeter roof with internal pelmet
- Roof lantern and glazed panels
How long does it take?
Build time is typically 8 to 12 weeks on site. Allow time beforehand for drawings and approvals, usually 6 to 12 weeks.
Building in Pembroke Dock
Wales has many terraced valley streets, stone cottages and post-war estates, so extension designs are shaped by slopes, materials and local character.
Pembroke Dock sits in Dyfed, about 29 miles west of Carmarthen. We cover the whole of Pembroke Dock, including postcodes SA72.
How it works
- 01
Survey and brief
We visit, discuss your ideas and budget, and survey the property or site at no cost.
- 02
Drawings and written quote
We prepare the design and give you a written, itemised quote with inclusions and exclusions.
- 03
Approvals
Planning or permitted development confirmation, building regulations and any party wall matters.
- 04
Build and sign-off
We run the build to a written programme and hand over the completion certificate.
Questions about orangeries in Pembroke Dock
How much does an orangery cost in Pembroke Dock?
In Pembroke Dock, an orangery typically costs £2,200–£3,150 per m² of floor area, including VAT at 20% (standard rate). A typical 16 m² project comes to roughly £35,000–£50,500. Your fixed price depends on the survey and drawings.
Can an orangery replace a conservatory?
Yes. We can remove an old conservatory and build an orangery on new or upgraded foundations.
How long does an orangery take in Pembroke Dock?
Typically 8 to 12 weeks on site. Design and approvals beforehand usually take 6 to 12 weeks.
Do I need planning permission for an orangery in Pembroke Dock?
In Wales a single-storey rear extension is often permitted development: up to 4 metres beyond the rear wall and up to 4 metres high, with eaves no higher than 3 metres within 2 metres of a boundary and no more than half the land around the original house covered. Wales has no larger home extension prior approval route, so deeper extensions need a planning application, as do extensions to flats, listed buildings and houses whose rights have been removed.
Can it be used all year?
Yes. With an insulated roof, efficient glazing and heating, an orangery is comfortable all year.
Does an orangery need building regulations approval?
If it is open to the house or does not meet the conservatory exemption, yes. Most orangeries are treated as extensions and need building control approval, which we arrange.
