SK Developments Free home visit0800 088 6248 Get a quote

EnglandOrangeries

Orangeries in Wiltshire

Planning an orangery in Wiltshire? We survey, design, handle planning or permitted development checks and build, with building control sign-off at the end.

Guide price in Wiltshire

£2,450–£3,450 per m² of floor area

In Wiltshire, an orangery typically costs £2,450–£3,450 per m² of floor area, including VAT at 20% (standard rate). For a typical 16 m² project that is roughly £39,000–£55,000.

Book a free home visit

Tell us about your project. We reply to arrange a visit and a fixed quote.

Free home visit and measured survey
Fixed price for the agreed specification
Drawings, approvals and build in one contract
Building control sign-off arranged
England, Wales, Scotland and Northern Ireland

What is an orangery?

Brick orangery with white French doors, glazed panels and a central roof lantern at sunset

An orangery is an extension with brick or block piers, large areas of glazing and a solid perimeter roof around a central roof lantern. It sits between a conservatory and a traditional extension: brighter than an extension, warmer and more private than a conservatory.

How much does an orangery cost in Wiltshire?

In Wiltshire, an orangery typically costs £2,450–£3,450 per m² of floor area, including VAT at 20% (standard rate). For a typical 16 m² project that is roughly £39,000–£55,000. Building costs in the South West are close to the UK average, so the figures for Wiltshire are close to our national guide. Design, structural calculations and council fees are extra.

Guide prices for Wiltshire, including VAT at 20% (standard rate)
Size or typeGuide range
Smaller project (11 m²)£27,000–£38,000
Typical project (16 m²)£39,000–£55,000
Larger project (22 m²)£54,000–£76,000
Rate per m²£2,450–£3,450

The main things that change the cost:

  • Frame material and colour
  • Size and shape of the footprint
  • Heating and flooring
  • Lantern size

Your exact price depends on the survey and drawings. The guide price tool gives a quick range in the meantime.

Do you need planning permission for an orangery in Wiltshire?

Approvals for an orangery in Wiltshire follow the rules for England. In England a single-storey rear extension is often permitted development: broadly up to 3 metres deep on a semi-detached or terraced house and 4 metres on a detached house, no higher than 4 metres, with eaves no higher than 3 metres within 2 metres of a boundary, and covering no more than half the garden. The larger home extension scheme allows up to 6 or 8 metres if you notify the council first and neighbours have a chance to comment. In conservation areas, National Parks and National Landscapes the larger home extension route, side extensions and cladding are not permitted development. Flats and houses whose rights have been removed need a planning application, and listed buildings need listed building consent.

Where work involves a shared wall, building on the boundary, or digging foundations within 3 metres of a neighbour’s building and deeper than its foundations (or within 6 metres for deeper work), the Party Wall etc. Act 1996 applies and notices must be served before work starts.

If the answer is not clear-cut, we can apply for formal confirmation before you commit to the build.

What we handle

Handled as part of most orangeries:

  • Design to suit the style of the house
  • Insulated perimeter roof with internal pelmet
  • Roof lantern and glazed panels
  • Flooring and decoration options
  • Building control sign-off where required
  • French, sliding or bifold doors

How long does it take?

Build time is typically 8 to 12 weeks on site. Allow time beforehand for drawings and approvals, usually 6 to 12 weeks.

Building in Wiltshire

In parts of the South West, protected landscapes and conservation areas shape what can be built, so materials and roof forms are chosen carefully.

Towns we cover in Wiltshire include Swindon, Salisbury, Trowbridge, Chippenham and Melksham.

How it works

  1. 01

    Survey and brief

    We visit, discuss your ideas and budget, and survey the property or site at no cost.

  2. 02

    Design and pricing

    Design options, then a fixed quote based on the chosen drawings and specification.

  3. 03

    Approvals

    Planning or permitted development confirmation, building regulations and any party wall matters.

  4. 04

    Build and handover

    Work follows the agreed programme, with inspections along the way and a completion certificate at the end.

Questions about orangeries in Wiltshire

Do you build orangeries in Wiltshire?

Yes. We build orangeries across Wiltshire, including postcodes BA12, BA13, BA14, BA15 and RG17. Every project starts with a free home visit.

How much does an orangery cost in Wiltshire?

In Wiltshire, an orangery typically costs £2,450–£3,450 per m² of floor area, including VAT at 20% (standard rate). A typical 16 m² project comes to roughly £39,000–£55,000. Your fixed price depends on the survey and drawings.

Can an orangery replace a conservatory?

Yes. We can remove an old conservatory and build an orangery on new or upgraded foundations.

Can it be used all year?

Yes. With an insulated roof, efficient glazing and heating, an orangery is comfortable all year.

How long does it take?

Typically 8 to 12 weeks on site once approvals are in place.

Start with a guide price, then book a free survey for a fixed quote in Wiltshire.

Call 0800 088 6248 or get an instant guide price online.

Call 0800 088 6248Get a guide price