What is a planning or building regulations application?

Planning permission decides whether a project can be built; building regulations decide how it must be built. Most extensions, lofts and conversions need building regulations approval even when planning permission is not required.
How much does a planning or building regulations application cost in Bangor, Gwynedd?
In Bangor, a planning or building regulations application typically costs £750–£2,250 for application management (council fees extra), including VAT at 20% (standard rate; planning application fees carry no VAT, council building control fees include VAT). Prices across Wales are typically 8% below the UK average for this kind of work, which is reflected in the range for Bangor. Council application fees are extra.
| Size or type | Guide range |
|---|---|
| Application management (council fees extra) | £750–£2,250 |
| Larger or more complex projects | £2,250–£2,750 |
What moves the price most:
- Planning conditions
- Revisions requested by the council
- Council fees
- Party wall surveyor appointments
A guide range is only a starting point: the guide price tool gives an instant figure for your size, and a free survey turns it into a fixed quote.
Planning and building regulations in Bangor, Gwynedd
Here is how the rules work for a planning or building regulations application in Wales. In Wales applications go to the local planning authority, and building control can be the council or a registered building control approver.
Building regulations in Wales are set by the Welsh Government. Approval comes from the council’s building control service or a registered building control approver, with inspections during the work and a completion certificate at the end.
Our first visit includes a check of your planning history, so you know the route before paying for drawings.
What we handle
What we take care of:
- Permitted development assessment
- Build-over agreements with the water company
- Discharge of planning conditions
- Party wall notices
- Lawful development certificate applications
- Planning or householder applications
How long does it take?
Allow about 8 weeks for a householder planning decision (two months in Scotland). If the drawings are for a planning application, add the council’s decision period once they are submitted.
Building in Bangor, Gwynedd
Wales has many terraced valley streets, stone cottages and post-war estates, so extension designs are shaped by slopes, materials and local character.
Projects in Bangor (LL57) are surveyed in person before we quote, so the price reflects your actual property.
How it works
- 01
Measured survey
We visit and measure the house so the drawings start from accurate information.
- 02
Concept design
Options for layout and appearance, revised until you are happy.
- 03
Drawings and documents
The drawings and forms the council and building control need.
- 04
Submission and follow-up
We submit the application and deal with questions from the council or building control.
Questions about planning and building regulations applications in Bangor, Gwynedd
Do you handle planning and building regulations applications in Bangor?
Yes. We handle planning and building regulations applications across Bangor, including postcodes LL57. Every project starts with a free home visit.
What is a lawful development certificate?
A certificate from the council confirming that a project is permitted development. It is optional but useful when selling the house.
What happens if I build without approval?
The council can take enforcement action, and missing approvals cause problems when selling. It is always better to get approvals first.
How long does a planning decision take?
Councils aim to decide most householder applications within 8 weeks.
How much does a planning or building regulations application cost in Bangor?
In Bangor, a planning or building regulations application typically costs £750–£2,250 for application management (council fees extra), including VAT at 20% (standard rate; planning application fees carry no VAT, council building control fees include VAT). Your fixed price depends on the survey and drawings.
