What is a planning or building regulations application?

Planning permission decides whether a project can be built; building regulations decide how it must be built. Most extensions, lofts and conversions need building regulations approval even when planning permission is not required.
How much does a planning or building regulations application cost in Bow?
In Bow, a planning or building regulations application typically costs £1,000–£3,250 for application management (council fees extra), including VAT at 20% (standard rate; planning application fees carry no VAT, council building control fees include VAT). We start from a UK-wide guide and adjust it for London, where labour and materials are typically about 30% above average. Council application fees are extra.
| Size or type | Guide range |
|---|---|
| Application management (council fees extra) | £1,000–£3,250 |
| Larger or more complex projects | £3,250–£4,000 |
The biggest cost drivers are:
- Type of application
- Building control route
- Revisions requested by the council
- Planning conditions
For a figure based on your own measurements, try the guide price tool, then book a free home visit for a fixed quote.
Planning and building regulations in Bow
Approvals for a planning or building regulations application in Bow follow the rules for England. In England householder applications, lawful development certificates and prior approvals for larger home extensions go to the local planning authority. Building control can be the council or a registered building control approver.
Building regulations approval comes from the council’s building control service or a registered building control approver. The work is inspected at key stages, such as foundations, drainage and insulation, and a completion certificate is issued at the end.
We check this for your address before design work starts, so there are no surprises later.
What we handle
Handled as part of most planning and building regulations applications:
- Permitted development assessment
- Discharge of planning conditions
- Planning or householder applications
- Build-over agreements with the water company
- Party wall notices
- Lawful development certificate applications
How long does it take?
Allow about 8 weeks for a householder planning decision (two months in Scotland). If the drawings are for a planning application, add the council’s decision period once they are submitted.
Building in Bow
Victorian and Edwardian terraces dominate many London streets, which is why side return, wraparound and mansard projects are so common here.
Bow sits in Greater London, about 5 miles east of central London. We cover the whole of Bow, including postcodes E3.
How it works
- 01
Measured survey
We visit and measure the house so the drawings start from accurate information.
- 02
Concept design
Options for layout and appearance, revised until you are happy.
- 03
Application drawings
Plans, elevations and supporting documents prepared for the council.
- 04
Approval
We follow the application through to a decision and pass on the approved drawings.
Questions about planning and building regulations applications in Bow
What is a lawful development certificate?
A certificate from the council confirming that a project is permitted development. It is optional but useful when selling the house.
What happens if I build without approval?
The council can take enforcement action, and missing approvals cause problems when selling. It is always better to get approvals first.
Do you handle planning and building regulations applications in Bow?
Yes. We handle planning and building regulations applications across Bow, including postcodes E3. Every project starts with a free home visit.
How long does a planning decision take?
Councils aim to decide most householder applications within 8 weeks.
How much does a planning or building regulations application cost in Bow?
In Bow, a planning or building regulations application typically costs £1,000–£3,250 for application management (council fees extra), including VAT at 20% (standard rate; planning application fees carry no VAT, council building control fees include VAT). Your fixed price depends on the survey and drawings.
