What is a planning or building regulations application?

Planning permission decides whether a project can be built; building regulations decide how it must be built. Most extensions, lofts and conversions need building regulations approval even when planning permission is not required.
How much does a planning or building regulations application cost in Bromsgrove?
In Bromsgrove, a planning or building regulations application typically costs £750–£2,500 for application management (council fees extra), including VAT at 20% (standard rate; planning application fees carry no VAT, council building control fees include VAT). Building costs in the West Midlands are close to the UK average, so the figures for Bromsgrove are close to our national guide. Council application fees are extra.
| Size or type | Guide range |
|---|---|
| Application management (council fees extra) | £750–£2,500 |
| Larger or more complex projects | £2,500–£3,000 |
The biggest cost drivers are:
- Revisions requested by the council
- Planning conditions
- Party wall surveyor appointments
- Building control route
Use the guide price tool to see how size and specification change the figure, then ask for a written, itemised quote.
Planning and building regulations in Bromsgrove
Whether you need planning permission depends on your house and its location in England. In England householder applications, lawful development certificates and prior approvals for larger home extensions go to the local planning authority. Building control can be the council or a registered building control approver.
Where work involves a shared wall, building on the boundary, or digging foundations within 3 metres of a neighbour’s building and deeper than its foundations (or within 6 metres for deeper work), the Party Wall etc. Act 1996 applies and notices must be served before work starts.
We check this for your address before design work starts, so there are no surprises later.
What we handle
On a typical planning or building regulations application we handle:
- Lawful development certificate applications
- Build-over agreements with the water company
- Party wall notices
- Permitted development assessment
- Building control application and inspections
- Prior approval (larger home extension) in England
How long does it take?
Allow about 8 weeks for a householder planning decision (two months in Scotland). If the drawings are for a planning application, add the council’s decision period once they are submitted.
Building in Bromsgrove
Across the West Midlands, inter-war and post-war semis make up much of the housing, giving good scope for two-storey side extensions and hip-to-gable lofts.
We work across Bromsgrove and neighbouring areas such as Redditch, Droitwich and Halesowen. Postcodes we cover in Bromsgrove include B61.
How it works
- 01
Measured survey
We visit and measure the house so the drawings start from accurate information.
- 02
Design options
Sketch layouts to agree the approach before detailed drawing starts.
- 03
Application drawings
Plans, elevations and supporting documents prepared for the council.
- 04
Submission and follow-up
We submit the application and deal with questions from the council or building control.
Questions about planning and building regulations applications in Bromsgrove
What happens if I build without approval?
The council can take enforcement action, and missing approvals cause problems when selling. It is always better to get approvals first.
Do you handle planning and building regulations applications in Bromsgrove?
Yes. We handle planning and building regulations applications across Bromsgrove, including postcodes B61. Every project starts with a free home visit.
How much does a planning or building regulations application cost in Bromsgrove?
In Bromsgrove, a planning or building regulations application typically costs £750–£2,500 for application management (council fees extra), including VAT at 20% (standard rate; planning application fees carry no VAT, council building control fees include VAT). Your fixed price depends on the survey and drawings.
What is a lawful development certificate?
A certificate from the council confirming that a project is permitted development. It is optional but useful when selling the house.
How long does a planning decision take?
Councils aim to decide most householder applications within 8 weeks.