What is a planning or building regulations application?

Planning permission decides whether a project can be built; building regulations decide how it must be built. Most extensions, lofts and conversions need building regulations approval even when planning permission is not required.
How much does a planning or building regulations application cost in Cambridgeshire?
In Cambridgeshire, a planning or building regulations application typically costs £750–£2,750 for application management (council fees extra), including VAT at 20% (standard rate; planning application fees carry no VAT, council building control fees include VAT). Prices across the East of England are typically 6% above the UK average for this kind of work, which is reflected in the range for Cambridgeshire. Council application fees are extra.
| Size or type | Guide range |
|---|---|
| Application management (council fees extra) | £750–£2,750 |
| Larger or more complex projects | £2,750–£3,500 |
What moves the price most:
- Party wall surveyor appointments
- Planning conditions
- Council fees
- Revisions requested by the council
Your exact price depends on the survey and drawings. The guide price tool gives a quick range in the meantime.
Planning and building regulations in Cambridgeshire
Before anything is built in Cambridgeshire, we confirm which approvals apply in England. In England householder applications, lawful development certificates and prior approvals for larger home extensions go to the local planning authority. Building control can be the council or a registered building control approver.
Building regulations approval comes from the council’s building control service or a registered building control approver. The work is inspected at key stages, such as foundations, drainage and insulation, and a completion certificate is issued at the end.
We check this for your address before design work starts, so there are no surprises later.
What we handle
On a typical planning or building regulations application we handle:
- Build-over agreements with the water company
- Lawful development certificate applications
- Party wall notices
- Discharge of planning conditions
- Permitted development assessment
- Building control application and inspections
How long does it take?
Allow about 8 weeks for a householder planning decision (two months in Scotland). If the drawings are for a planning application, add the council’s decision period once they are submitted.
Building in Cambridgeshire
Many towns in the East of England have estates built since the 1970s, where garage conversions and rear extensions are popular.
Towns we cover in Cambridgeshire include Peterborough, Cambridge, Wisbech, St Neots, Huntingdon and March.
How it works
- 01
Survey and brief
We visit, talk through what you want and record the existing building.
- 02
Concept design
Options for layout and appearance, revised until you are happy.
- 03
Application drawings
Plans, elevations and supporting documents prepared for the council.
- 04
Approval
We follow the application through to a decision and pass on the approved drawings.
Questions about planning and building regulations applications in Cambridgeshire
Do you handle planning and building regulations applications in Cambridgeshire?
Yes. We handle planning and building regulations applications across Cambridgeshire, including postcodes CB1, CB10, CB2, CB21 and CB22. Every project starts with a free home visit.
How much does a planning or building regulations application cost in Cambridgeshire?
In Cambridgeshire, a planning or building regulations application typically costs £750–£2,750 for application management (council fees extra), including VAT at 20% (standard rate; planning application fees carry no VAT, council building control fees include VAT). Your fixed price depends on the survey and drawings.
Who carries out building control?
Either the council’s building control service or, in England and Wales, a private building control body registered to do the work. In Scotland and Northern Ireland building control is provided by the council.
How long does a planning decision take?
Councils aim to decide most householder applications within 8 weeks.
What is a lawful development certificate?
A certificate from the council confirming that a project is permitted development. It is optional but useful when selling the house.