SK Developments Free home visit0800 088 6248 Get a quote

KentPlanning and building regulations

Planning and building regulations in Deal

Need planning and building regulations applications in Deal? We survey the house, prepare the drawings with the architectural technicians we work with and coordinate the structural calculations.

Guide price in Deal

£750–£2,750 for application management (council fees extra)

In Deal, a planning or building regulations application typically costs £750–£2,750 for application management (council fees extra), including VAT at 20% (standard rate; planning application fees carry no VAT, council building control fees include VAT).

Book a free home visit

Tell us about your project. We reply to arrange a visit and a fixed quote.

Free home visit and measured survey
Fixed price for the agreed specification
Drawings, approvals and build in one contract
Building control sign-off arranged
England, Wales, Scotland and Northern Ireland

What is a planning or building regulations application?

Surveyor measuring the rear of a brick semi-detached house with a laser measure

Planning permission decides whether a project can be built; building regulations decide how it must be built. Most extensions, lofts and conversions need building regulations approval even when planning permission is not required.

How much does a planning or building regulations application cost in Deal?

In Deal, a planning or building regulations application typically costs £750–£2,750 for application management (council fees extra), including VAT at 20% (standard rate; planning application fees carry no VAT, council building control fees include VAT). Prices across the South East are typically 12% above the UK average for this kind of work, which is reflected in the range for Deal. Council application fees are extra.

Guide prices for Deal, including VAT at 20% (standard rate; planning application fees carry no VAT, council building control fees include VAT)
Size or typeGuide range
Application management (council fees extra)£750–£2,750
Larger or more complex projects£2,750–£3,500

The biggest cost drivers are:

  • Council fees
  • Revisions requested by the council
  • Building control route
  • Type of application

Use the guide price tool to see how size and specification change the figure, then ask for a written, itemised quote.

Planning and building regulations in Deal

Here is how the rules work for a planning or building regulations application in England. In England householder applications, lawful development certificates and prior approvals for larger home extensions go to the local planning authority. Building control can be the council or a registered building control approver.

Building regulations approval comes from the council’s building control service or a registered building control approver. The work is inspected at key stages, such as foundations, drainage and insulation, and a completion certificate is issued at the end.

At the survey we check your house’s planning history and any restrictions, and tell you which route applies.

What we handle

Handled as part of most planning and building regulations applications:

  • Build-over agreements with the water company
  • Discharge of planning conditions
  • Building control application and inspections
  • Party wall notices
  • Permitted development assessment
  • Lawful development certificate applications

How long does it take?

Allow about 8 weeks for a householder planning decision (two months in Scotland). If the drawings are for a planning application, add the council’s decision period once they are submitted.

Building in Deal

Commuter towns across the South East have many 1930s and post-war semis that suit rear extensions and hip-to-gable loft conversions.

Our Deal coverage includes postcode districts CT14, and we also work in nearby places such as Dover, Ramsgate and Broadstairs.

How it works

  1. 01

    Measured survey

    We visit and measure the house so the drawings start from accurate information.

  2. 02

    Design options

    Sketch layouts to agree the approach before detailed drawing starts.

  3. 03

    Drawings and documents

    The drawings and forms the council and building control need.

  4. 04

    Submission and follow-up

    We submit the application and deal with questions from the council or building control.

Questions about planning and building regulations applications in Deal

What is a lawful development certificate?

A certificate from the council confirming that a project is permitted development. It is optional but useful when selling the house.

How long does a planning decision take?

Councils aim to decide most householder applications within 8 weeks.

Do I need a party wall agreement?

In England and Wales, if your work affects a shared wall, boundary or nearby foundations, notices must be served. Neighbours can consent or appoint surveyors.

How much does a planning or building regulations application cost in Deal?

In Deal, a planning or building regulations application typically costs £750–£2,750 for application management (council fees extra), including VAT at 20% (standard rate; planning application fees carry no VAT, council building control fees include VAT). Your fixed price depends on the survey and drawings.

Do you handle planning and building regulations applications in Deal?

Yes. We handle planning and building regulations applications across Deal, including postcodes CT14. Every project starts with a free home visit.

Tell us about your project in Deal and we will arrange a free home visit.

Call 0800 088 6248 or get an instant guide price online.

Call 0800 088 6248Get a guide price